Culni homeCheck my home
Menu

Why solar panels shut off in a power outage, and what keeps them running

Do solar panels work during a power outage? Not on their own. Why grid-tied inverters shut off, and what a battery, V2H or a generator changes.

Reader question
Why does my grid-tied solar stop working when the power goes out, and what equipment lets it keep powering the house?
An enamel picture of a wooden marionette slumped on a small lit stage, its strings slack and its control bar lying on the floor.

Usually not. A grid-tied solar system without a battery or dedicated backup equipment stops producing within about 2 seconds of a grid outage, because the interconnection standard IEEE 1547-2018 requires its inverter to detect the outage, stop energizing the lines and trip offline. Solar keeps powering a house only when the home has two additions: a device that separates the house from the grid automatically, and an inverter that can set its own voltage and frequency without the grid, most often a home battery.

The rest of this article explains why the shutdown happens and what the standards require. It then sorts the four ways to keep power during an outage (a battery, daytime backup without a battery, an electric vehicle with vehicle-to-home equipment, and a generator) by what each one needs and what it can carry. It ends with what a solar-only home should expect when the grid goes down and the questions to put to an installer.

Why grid-tied solar shuts off when the grid goes down

Grid-tied solar shuts off in an outage because its inverter is designed and tested to stop as soon as it loses the grid. That behavior is called anti-islanding, and it exists to protect the people who repair the lines and the equipment connected to them.

What the inverter does in normal operation

Solar panels make direct current (DC). The inverter converts it into alternating current (AC) that the house and the grid can use, as the Department of Energy’s inverter basics page explains. Most rooftop inverters are what DOE calls grid-following: they “require an outside signal from the electrical grid” to know what voltage and frequency to produce.

A grid-following inverter pushes current in step with a waveform it did not create. On a normal day the utility supplies that waveform, and the inverter simply adds its current to it. When the waveform disappears, the inverter has nothing to follow.

What an island is and why it is dangerous

An island is a piece of the power system that stays energized by local generation after it has been cut off from the utility. NREL’s primer on the unintentional islanding requirement (NREL/TP-5D00-77782, April 2022) defines it as a condition in which a distributed energy resource “continues to energize a portion of the power system when it is electrically isolated from the utility source.”

The primer names the utilities’ two main concerns: personnel safety and harm to customer and utility equipment. If an island persists, lines that a crew presumes to be dead could be live, which exposes utility workers and the public to electrical hazards. A small generator may also fail to hold voltage and frequency on its own, which can damage connected equipment.

There is a third problem that most homeowners never hear about. A recloser is a switch on a distribution line that opens when it senses a fault and then tries to close again after a short interval. The primer notes that if a recloser closes back onto a line that a rooftop system is still energizing, the two sides may have drifted out of phase, which can trip the line again or damage equipment.

The 2-second rule in IEEE 1547-2018

IEEE 1547-2018 is the US standard for connecting distributed energy resources, such as rooftop solar and home batteries, to the grid. Its IEEE standard page lists “response to abnormal conditions, power quality, islanding, and test specifications” among its requirements; the standard was approved on February 15, 2018 and published on April 6, 2018.

According to the NREL primer, Clause 8.1.1 requires a distributed energy resource to cease to energize and trip within 2 seconds after an island forms. That 2-second limit is called the clearing time. Clause 8.1.2 allows the utility and the system owner to agree on a clearing time between 2 and 5 seconds.

Two terms in that requirement have precise meanings:

  • Cease to energize is a “cessation of active power delivery under steady-state and transient conditions and limitation of reactive power exchange.” In plain terms, the inverter stops pushing power out.
  • Trip is an “inhibition of immediate return to service, which may involve disconnection.” The inverter does not come straight back.

After a trip, the inverter stays offline for a return-to-service delay. The primer says this delay is 5 minutes by default under IEEE 1547-2018 and can be changed by mutual agreement between the utility and the system owner. That delay is why panels do not start producing again the instant power returns.

How UL 1741 testing fits in

UL 1741 is the safety standard under which inverters and interconnection equipment are certified. UL’s product page shows edition 3, published September 28, 2021, covering “inverters, converters, charge controllers, and interconnection system equipment,” including interactive units “intended to be operated in parallel with an electric power system.” Its requirements for that grid-connected equipment are written to be used with IEEE 1547 and its test companion, IEEE 1547.1.

The NREL primer describes how the pieces connect. For most residential and commercial equipment, the manufacturer builds the islanding detection into the inverter. A testing agency type-tests a representative unit using the procedures in IEEE 1547.1-2020, and the primer calls UL 1741 “the primary means of equipment certification” for interconnection. The certified equipment is then installed under the National Electrical Code (NFPA 70).

State rules point to the same standards. In Kentucky, where Culni’s office is, KRS 278.466(7) requires the generating systems and interconnecting equipment of net-metered customers to meet the applicable safety and power quality standards of the NEC, IEEE and accredited testing laboratories such as Underwriters Laboratories.

Standard or rule What it covers What it means when the grid goes down
IEEE 1547-2018 How distributed energy resources connect to and behave on the grid Cease to energize and trip within 2 seconds of an island forming (adjustable to 5 seconds by agreement), then wait out a 5-minute default delay
IEEE 1547.1-2020 Test procedures for IEEE 1547 The anti-islanding function is type-tested on a representative unit of each model
UL 1741 Safety certification of inverters and interconnection equipment The inverter’s listing covers the interconnection tests
NFPA 70 (National Electrical Code) How equipment is installed Wiring, disconnects and backup panels are installed to code and inspected locally
State law, for example KRS 278.466(7) Conditions for net-metered systems The utility interconnects equipment that meets these standards

What happens, second by second, when the power goes out

The sequence is short. The grid drops, the inverter stops within 2 seconds, and nothing restarts until the grid has been back for the return-to-service delay. Brief disturbances are handled differently from a real outage.

What a grid-tied solar system does during an outage, with and without battery backupTwo timelines. Solar only: the inverter stops within 2 seconds of the grid failing, produces nothing for the whole outage, and restarts after a 5-minute default delay once the grid returns. With a battery and an automatic disconnect: the house separates from the grid, the battery forms a local grid and solar keeps running until the grid returns and the house reconnects. Solar only (grid-following inverter) Exporting No output while the grid is down Restarts Stops within 2 s 5 min default delay With a battery and an automatic disconnect Battery forms the grid, solar runs Exporting Disconnect opens Reconnects to the grid Grid fails Grid returns
Diagram, not to scale. Timing from IEEE 1547-2018 Clauses 8.1.1 and 8.1.2 as summarized in NREL's primer (NREL/TP-5D00-77782, April 2022): a 2-second default clearing time and a 5-minute default return-to-service delay, both adjustable by agreement with the utility. Reconnection behavior of battery systems varies by equipment.

Here is the sequence for a solar-only home:

  1. The grid fails. A tree takes down a line, or a breaker upstream opens. The voltage the inverter was following is gone.
  2. Within 2 seconds, the inverter ceases to energize and trips. The panels are still in the sun, but no power flows from them into the house.
  3. The outage lasts as long as it lasts. Solar production stays at zero the whole time, whether it is 10 minutes or three days.
  4. The grid returns. The utility restores the line.
  5. The inverter waits out the return-to-service delay, then resumes. Under the IEEE 1547-2018 default, that is 5 minutes. No one has to press anything.

Not every flicker causes this. DOE’s inverter page says modern inverters can “ride through” small disruptions in voltage or frequency instead of tripping at every disturbance; when a disruption lasts too long or is larger than normal, they “disconnect themselves from the grid and shut down.” So a momentary dip may leave solar running, while a sustained outage always stops it.

Three practical points follow. A shutdown during an outage is normal operation, not a fault. Production returns on its own a few minutes after the grid does. And a system that stops during every short flicker may have ride-through settings worth asking the installer about.

Why the panels cannot simply power your own house

Even with full sun on the roof, a standard grid-tied system cannot run the house alone. Two things are missing: a disconnect that separates the house from the utility, and a source that sets voltage and frequency and balances supply against demand from moment to moment.

The house must be separated from the grid first

As long as the house is connected to the utility’s lines, anything that energizes its wiring also energizes the street. That is why every safe backup design starts with a way to open the connection to the grid before the house is powered from anything else.

DOE’s page on distributed energy resources and microgrids describes microgrids as “localized electric grids that can disconnect from the main grid to operate autonomously,” which is intentional islanding. The same page notes that “many solar energy systems are programmed to detect islanding and disconnect from the grid if it occurs.” A home backup system is a very small microgrid: it islands on purpose, behind a disconnect, instead of by accident.

The disconnect goes by different names. Enphase’s homeowner guide describes a system controller that “automatically detects utility power outages” and moves the home to backup power. Tesla’s vehicle-to-home page lists an “islanding controller” that “detects when the grid is down and switches your home’s power source from the grid to your EV while preventing back-feeding into the grid.” With a generator, the device is a transfer switch.

Something must form the grid

Once the house is isolated, something has to create the AC waveform that everything else follows. DOE says “more advanced grid-forming inverters can generate the signal themselves,” unlike grid-following ones. The same page notes that grid-forming inverters can even restart a grid that has gone down, which is called black start.

In a home, the grid-forming source is usually a battery inverter built for backup. Some solar microinverters are grid-forming too, which is what makes battery-free daytime backup possible. A grid-following string inverter cannot do this job on its own, whatever the weather.

Supply must match demand every second

On the grid, the utility absorbs any mismatch between what your panels make and what your house uses. In an island, nothing does that for you. The grid-forming source must cover every surge, such as a compressor starting, and absorb every surplus, such as a sunny hour when the house is quiet.

A battery handles both directions: it discharges when the house needs more than the panels make and charges when the panels make more. Without a battery, the backed-up loads have to stay below what the sun provides in that minute, which is why battery-free backup is limited to a few small circuits. And when a battery is full and the house uses less than the panels make, the system has to hold solar output back, because there is nowhere for the surplus to go. How the equipment does that depends on the design, and the installer confirms that it works with your inverters.

So a backup-capable solar home needs four things:

  1. An automatic disconnect that opens the connection to the grid.
  2. A grid-forming source, usually a battery inverter.
  3. A defined set of backed-up circuits sized to what that source can carry.
  4. A way to limit solar production when the battery is full.

Four ways to keep power in an outage, compared

There are four practical routes to power during an outage. Three of them can use your solar; the fourth, a generator, works without it. They differ in what they add to the house, when they work and how much they can carry.

Battery with backup wiringDaytime backup without a batteryEV with vehicle-to-home equipmentGenerator with transfer switch
What it addsBattery, grid-forming inverter, automatic disconnect, often a backup panelGrid-forming microinverters, a system controller and load controllersBidirectional EV, bidirectional charger, inverter, islanding controllerGenerator and a transfer switch installed by an electrician
Uses your solar in the outageYes, if the system is designed to recharge from solar off-gridYes, solar is the only sourceYes, if the design lets solar recharge the carNo, unless the battery or inverter system is designed for it
Works at nightYes, from stored energyNoYes, from the car's batteryYes, while fuel lasts
What it can carrySet by the inverter's kW and the battery's kWh; critical loads or the whole panelEssential loads only; Enphase says under 30% of the system's AC ratingSet by the charger, inverter and panel; the car's kWh sets the hoursSet by the generator's rating and the transfer equipment
Main limitEnergy runs down on cloudy daysClouds and load surges can shut it downThe car must be home and chargedFuel, noise, exhaust and carbon monoxide
Who confirms itInstaller, utility interconnection, local inspectorInstaller and manufacturer documentationVehicle maker, charger maker, electrician, utilityLicensed electrician, local inspector
Summary of the options described in this article. Sources: DOE inverter and microgrid basics pages; Enphase, Understanding Sunlight Backup system for homeowners; Tesla, Bidirectional Charging 101: Vehicle-to-Home (January 22, 2026); OSHA generator grounding fact sheet; CPSC Safety Alert 5123. Checked November 2026.

The sections below take each option in turn, with the numbers that decide whether it fits your home.

A battery with backup wiring

A home battery with backup wiring is the option that lets solar run day and night during an outage. The battery inverter forms the grid, the disconnect isolates the house, and the panels recharge the battery while the sun is up, if the system was designed to do so.

Power and energy are separate limits

A battery has two ratings that matter in an outage. Power, in kW, is how much it can deliver at one moment: it decides which appliances can run together. Energy, in kWh, is how much it holds: it decides how many hours they can run. A battery can have plenty of kWh left and still shut off because too many loads started at once.

Surges matter as well as steady loads. Motors in well pumps, sump pumps and air conditioners draw more for a moment when they start than when they run. The installer checks those starting loads against the inverter’s ratings, because the battery is the only thing that can supply them once the house is isolated.

Whole-home or critical loads

There are two common layouts. In one, the disconnect sits between the utility and the main panel, so every circuit is backed up and you manage what runs. In the other, the circuits you choose move to a separate critical loads panel, and everything else goes dark in an outage.

Whole-panel backup is simpler to live with but easier to overload. A critical loads panel protects the battery from the clothes dryer and the EV charger, but only the circuits you picked will work. The trade-offs, and the hardware limits behind them, are covered in whole-home vs partial backup.

Example (fictional). The example home has 7.6 kW of solar, a 13.5 kWh battery rated at 5 kW, and a 20% reserve (2.7 kWh) kept for outages. Its critical loads (a refrigerator, the internet router, LED lights and phone charging) average 330 W. Assume a 95% efficient inverter, as the site’s backup runtime calculator does.

Suppose the grid fails at 9 p.m. on the scheduled April weekday shown on the fictional example home page, when the battery ends the evening peak holding 5.7 kWh. Energy available to the loads: 5.7 kWh x 0.95 = 5.4 kWh. Hours at 330 W: 5.4 kWh / 0.33 kW = 16.4 hours. From 9 p.m. to 8 a.m. is 11 hours, which uses 11 x 0.33 kW = 3.6 kWh, leaving 5.4 - 3.6 = 1.8 kWh when the panels start producing in earnest.

Now suppose the same outage hits on a day when the battery has already been run down to its reserve. Available: 2.7 kWh x 0.95 = 2.6 kWh, or 2.6 / 0.33 = 7.8 hours. The loads go dark at about 4:50 a.m., before the panels produce anything.

On a clear April day the panels make 36.3 kWh, against 0.33 kW x 24 hours = 7.9 kWh for the critical loads, so a full recharge is possible if the system can charge from solar while islanded. On a cloudy day it may not be. Backing up the whole house is a different case: the house uses 29.0 kWh on that day, more than twice the battery’s 13.5 kWh, and the car’s 7.2 kW charger alone exceeds the battery’s 5 kW rating.

The example shows why the state of charge at the moment the grid fails matters as much as the battery’s size. One clear spring day is not every day: a winter storm with heavy cloud is the case to plan for.

The reserve is the part you choose

The backup reserve is the share of the battery the daily schedule never spends, so it is there when an outage starts. A higher reserve buys more hours of backup and leaves less for covering the evening peak. You can raise it before a forecast storm; how to set a reserve before storms explains the trade-off and the settings.

Culni’s backup reserve feature works the same way: the schedule never plans below the reserve you choose, and the home energy plan shows the hours of backup that reserve gives for the loads you list. Culni does not change backup wiring, inverter protection or interconnection settings; those stay with the installer and the utility.

Daytime backup without a battery

Some solar systems built on grid-forming microinverters can power a few circuits from the sun alone during a daytime outage. This is real backup, but narrow: it works only while the sun is strong enough, only for small essential loads, and not at night.

What one manufacturer’s documentation says

Enphase’s Sunlight Backup is the clearest documented example, and its homeowner guide is unusually specific about the limits. The points below come from that guide; other manufacturers’ designs, where they exist, have their own rules.

  • Equipment. The system consists of IQ8 Series microinverters, the IQ System Controller 2 and the IQ Combiner 4C, and it needs at least one IQ Load Controller on site.
  • Circuits. It supports up to four 240 V or eight 120 V circuits. Each load controller handles two 240 V or four 120 V loads.
  • Size of loads. The guide says to keep backup loads under 30% of the system’s rated AC output. Its example: a 24-microinverter system rated 5.7 kW AC should stay under 1.7 kW.
  • Essential loads only. “Sunlight should only be used for the essential loads in the home,” and backing up the whole home “is not supported by Enphase.”
  • Clouds. Output depends on “cloud cover, shading on the PV panels, time of the year and other factors,” and the system “may shutdown if the power produced is less than what is needed to power the loads.”
  • Restarts. After a shutdown, the system “can take up to two minutes to restart,” powering loads back on 22 seconds apart. A load that causes five shutdowns is disabled, and if every load is disabled, the system retries after an hour.
  • Schedule. The default backup schedule runs from 9 a.m. to 4 p.m. and can be set between 7 a.m. and 8 p.m.
  • Internet first. The guide recommends giving the Wi-Fi router and modem the highest priority among essential circuits.

What that means for a real house

Daytime-only backup suits a home whose main worry is a long daytime outage: keeping the internet up for work, running a few lights and fans, and cooling the refrigerator while the sun is out. It does not cover the evening, and it is not a plan for medical equipment that must run around the clock.

Example (fictional). Take the Enphase guide’s own sizing case, a system rated 5.7 kW AC, which keeps backup loads under 0.30 x 5.7 kW = 1.7 kW. The example home’s critical loads average 330 W, or 0.33 kW, which fits under that line with room to spare, on average. But a refrigerator compressor that starts while a cloud passes may still trip the system, which then waits up to two minutes before restoring loads one at a time.

Suppose the household also wants a 1.5 kW window air conditioner on a backed-up circuit (a hypothetical rating; check the nameplate). Then 0.33 + 1.5 = 1.83 kW is above the 1.7 kW guideline before any compressor start, so the air conditioner is a poor fit for this kind of backup.

The refrigerator is the load most owners ask about. Daytime backup can run it while the sun is up, but it then sits unpowered through the night. Ready.gov’s power outage guidance is that a closed refrigerator “will keep food cold for about four hours” and a full freezer about 48 hours, so a long night without power is a gap to plan around.

Whether your existing system can add daytime backup depends on its inverters. Battery-free backup needs grid-forming inverters; a system built on grid-following inverters needs other hardware. The installer can tell you which kind you have and what adding it would involve.

An electric vehicle with vehicle-to-home equipment

A car with a large battery can power a house through an outage, but only with bidirectional equipment and a disconnect that isolates the home. Solar can then recharge the car during the day, extending the backup, if the system is designed that way.

What vehicle-to-home requires

Tesla’s vehicle-to-home explainer, dated January 22, 2026, lists the equipment that “all vehicle-to-home systems require”:

  • A bidirectional-capable EV, which can send energy from its battery back out.
  • A DC to AC inverter, located in the car in some systems and outside it in others.
  • A bidirectional charger (EV supply equipment) that lets power flow both ways.
  • An islanding controller that detects the outage and prevents back-feeding into the grid.
  • Panel capacity and a dedicated circuit. The page says homes with 100 A or smaller service panels may need upgrades, and that the charger needs a 40 to 60 A breaker.

Only some vehicles support this, and each vehicle maker specifies its own charger and controller. The detailed comparison of vehicles, equipment and runtime is in vehicle-to-home backup.

How long a car can carry a house

The same Tesla page gives a simple estimate: backup runtime is the battery’s capacity divided by daily use, and it notes that the estimate assumes a full battery, so the actual state of charge matters. Inverter losses and the charge you keep for driving reduce the result further.

Example (fictional). The site’s battery sizing worksheet default lists seven critical loads that add up to 7.80 kWh a day. Suppose a car holds 40 kWh above the charge the household wants to keep for driving, and the vehicle-to-home equipment delivers 95% of it (a hypothetical efficiency). Available: 40 x 0.95 = 38 kWh. Days of backup: 38 / 7.8 = 4.9 days for those loads, before any solar recharging.

Run the whole example house instead, at 29.0 kWh a day, and the same 38 kWh lasts 38 / 29.0 = 1.3 days.

The practical limits are as important as the arithmetic. The car has to be at home and plugged in when the outage starts, and every kWh the house uses is range the household cannot drive. In a storm that may be acceptable; in a heat wave, when someone needs to drive to work, it may not.

A generator with a transfer switch

A generator is the one option that does not depend on solar or stored energy. It brings its own fuel, which means it can run for days, but it also brings exhaust, noise and the most serious safety risks of any option here.

Connect it through transfer equipment, never an outlet

The Consumer Product Safety Commission’s safety alert on portable generators warns: “NEVER try to power the house wiring by plugging the generator into a wall outlet, a practice known as ‘backfeeding.’” It says this “presents an electrocution risk to utility workers and neighbors served by the same utility transformer” and “bypasses some of the built-in household circuit protection devices.”

OSHA’s fact sheet on generator grounding gives the alternative: never attach a portable generator to a structure’s electrical system “unless the generator has a properly installed open-transition transfer switch.” It adds that the transfer switch “must be approved for the use and installed in accordance with the manufacturer’s installation instructions by a qualified electrician,” and that a generator connected through a transfer switch must be connected to a grounding electrode system.

This is the same principle as anti-islanding, applied by hand. A transfer switch makes it impossible for the generator and the utility to feed the house wiring at the same time. Which kind of transfer equipment your panel can take is for a licensed electrician and your local inspector to decide.

Carbon monoxide is the larger risk

The CPSC alert says most incidents reported to it involve carbon monoxide poisoning from generators used indoors or in partly enclosed spaces, and that a generator should never run inside a home, garage, crawlspace or shed, “even when using fans or opening doors and windows.” Ready.gov says generators should be used outdoors and “at least 20 feet away from windows, doors and attached garages,” and recommends working carbon monoxide detectors on every level of the home.

How a generator works with solar

A generator does not turn grid-tied solar into backup power, and it is not built to absorb solar output. Whether the solar inverter stays off, or has to be kept off, while the generator carries the house depends on how the system is wired. Ask the installer and the electrician how they handle it before the first storm, not during it.

If you have a battery or plan one, also ask whether it has a generator input and how it manages solar production while the generator runs. That is a design question for the installer and the equipment documentation.

What a solar-only home should expect in an outage

If your system has no battery and no backup hardware, expect no power from the panels until the grid returns, and expect solar to restart on its own a few minutes after that. You do not need to switch anything off or on.

What you will see

The inverter or monitoring app shows production falling to zero when the outage starts, if the app can still report at all; the internet connection it relies on may be down too. Nothing is wrong with the panels. They will look and sound exactly as before, because the shutdown happens in the electronics.

What not to do

  • Do not open the main breaker to run the house on solar. A grid-following inverter still has no waveform to follow, so it will not start, and the main breaker is not a substitute for listed backup equipment.
  • Do not plug a generator into an outlet. That is backfeeding, and it puts line workers and neighbors at risk.
  • Do not reset or reconfigure the inverter. Its protection settings are part of your interconnection agreement. If production does not return after the grid has been back for a while, call the installer.

How often this matters

National averages put the question in proportion. The EIA reported in December 2025 that US electricity customers averaged 11 hours of interruptions in 2024, “nearly twice as many as the annual average experienced in the decade before.” Major events such as hurricanes caused 80% of those hours, while interruptions outside major events “routinely average about two hours per year.” Customers in South Carolina averaged nearly 53 hours.

Two things follow. Most outage time arrives in a few large storms, not spread evenly across the year. And your own exposure depends on where you live, so your local outage history is a better guide than the national average.

Plan for the outage you will actually have

Ready.gov’s advice applies to solar homes as much as any other: take an inventory of the items you need that rely on electricity, have a plan for refrigerated medicines and power-dependent medical devices, and keep refrigerators and freezers closed. The site’s outage readiness checklist turns that into a list to work through before storm season, and solar homes without a battery covers how to get more from panels that cannot help in an outage.

Questions to ask an installer before you add backup

The right backup depends on your loads, your panel and your existing equipment, so the best first step is a short list of questions. These are the ones that decide the design.

  1. Are my inverters grid-forming or grid-following? This decides whether battery-free daytime backup is possible and what a battery would need to add.
  2. Where would the automatic disconnect go, and what would it isolate? Ask whether it covers the whole main panel or a separate critical loads panel.
  3. Which circuits would be backed up? Get the list in writing, by breaker number, before installation.
  4. What continuous kW and starting surge can the backup source carry? Compare it with your largest motor loads, such as a well pump, sump pump or air conditioner.
  5. How many kWh are usable, and what reserve do you recommend? The usable figure, not the nameplate, sets the hours.
  6. Will solar recharge the battery during an outage? Ask how production is limited when the battery is full and the house is quiet.
  7. What happens at the moment the grid fails? Ask whether the house sees a brief interruption when the system switches to backup, and how long it lasts.
  8. How does the system reconnect when the grid returns? Ask about the return-to-service delay and whether anything needs your action.
  9. Does my service panel need work? Backup panels, vehicle-to-home equipment and generator transfer switches can all require panel changes.
  10. What does the utility require? Ask whether adding a battery or backup equipment changes your interconnection agreement or needs a new application.
  11. What permits and inspections apply? The local inspector has the final word on transfer equipment and backup panels.
  12. Can a generator be added later, and how? Ask whether the battery system has a generator input.
  13. What will the monitoring show during an outage? Know how you will see the battery’s state of charge when the internet is also down.

The devices page describes the equipment categories a home schedule can involve, from inverters and batteries to chargers, and how a connection is checked home by home.

What to do next

Start with your loads, not the hardware. List what must run in an outage with its watts, then work out how many hours you need and when: overnight, during the day, or for several days.

  • List your critical loads. The battery sizing worksheet turns a list of appliances into daily kWh and peak kW.
  • Turn a battery size and reserve into hours. The backup runtime calculator does the arithmetic from the example above for your own numbers.
  • Prepare before storm season. Work through the outage readiness checklist, including labeling the backed-up circuits.
  • Ask the installer the questions above before you buy, and keep the answers with your system documents.

If you already have a battery, or are planning one, the reserve you keep each day is what decides how the next outage starts. Culni is home energy software that reads a home’s electricity rate and runs one daily schedule across solar, a battery, EV charging and flexible loads; its home energy plan includes the backup reserve and the hours it gives for the loads you list. If you want that worked out for your home, you can send your rate plan, a recent bill and your device list through the contact page.

TodayYour turn

Want this worked out for your home?

Send your utility and rate plan, one recent bill and the devices you have or plan. We reply with a written home energy plan and every assumption behind it.

Remote. No site visit needed.