Often, yes: many houses with 100-amp service can run a heat pump, a heat pump water heater, electric cooking and EV charging, but a load calculation decides, not the number of breakers or the size of the main. The National Electrical Code gives existing homes two optional methods: one built from square footage and appliance nameplates, and one that starts from a year of the home’s measured peak demand. Homes that choose right-sized, lower-power equipment and let the biggest loads share capacity often stay under 100 amps on paper; homes that add large backup heat strips and a full-power EV charger usually do not. A licensed electrician runs the calculation, and the local inspector accepts it or not.
This guide works that calculation through real appliance lists, explains why government and advocacy sources disagree about 100 amps, and covers the cases where an upgrade is still the sensible call.
Why a load calculation decides, not the breakers in your panel
Your service size is the current your utility connection and main disconnect are rated to carry, and the code requires your calculated household load to fit inside it. The breakers in a panel almost always add up to far more than the main, and that is normal.
A 100 A service at 240 volts carries 24,000 volt-amperes (VA), about 24 kW, at its rating. Suppose an older panel holds a 40 A range breaker, a 30 A dryer breaker, a 30 A water heater breaker, a 30 A air conditioner breaker and a dozen 15 and 20 A circuits. The breaker ratings add up to well over 200 A, yet the house is not overloaded. DOE’s Building Science Education Solution Center factsheet on panel upgrades, prepared by the New Buildings Institute, explains why: appliance loads are usually lower than their breaker ratings, and not everything runs at once. It warns that you “cannot add up the breakers and subtract them from the panel rating” to find spare capacity.
The factsheet separates two kinds of room:
- Physical space: open slots for new breakers. A full panel can sometimes be helped with a subpanel or by rearranging circuits.
- Electrical space: the gap between the calculated load and the service rating. This is the number the code cares about.
A house can have one without the other. A 100 A panel with six empty slots may have no electrical space for a 48 A EV charger, and a crowded panel may have plenty of electrical space but nowhere to put a breaker.
Service, panel and main breaker are different ratings
“Panel size” is used loosely, so separate the parts:
| Part | What it is | What limits it |
|---|---|---|
| Service drop or lateral | Wires from the utility transformer to the house, usually the utility’s | The utility’s wire and transformer sizing |
| Meter base and service entrance conductors | Where the meter sits and the wires into the panel | Conductor size and the meter base rating |
| Panel busbar | The bars inside the panel that breakers clip onto | The busbar rating on the panel label |
| Main breaker or service disconnect | The breaker that shuts off the whole house | Its rating, often 100, 150 or 200 A |
Your effective service size is the lowest of these: a 200 A panel fed by 100 A service conductors is a 100 A service. DOE’s factsheet suggests three checks: an amperage label on the meter box, a label on the panel and the number on the main breaker. New York’s installer guide to assessing residential electrical service adds clues such as the height of the weather head and the shape of the meter panel, and it ends with the sentence that applies to this whole article: “A licensed electrician should always make the final assessment.”
DOE’s factsheet notes that the NEC requires a service of at least 100 amps, and ACEEE’s paper cites the 2021 International Residential Code’s 100-ampere minimum for single-family homes. ACEEE’s authors also write that many existing homes still have 60 A or 100 A panels. A 60 A service is a different conversation, covered later.
Where the sources disagree about 100 amps, and why
Government and advocacy sources give homeowners different answers about 100 A because they measure different things. Code-style calculations count nameplates and assume coincidence; field studies of meter data measure what homes actually drew.
| Source (read November 2026) | What it says about 100 A | What it rests on |
|---|---|---|
| New York State Clean Heat Connect (NYSERDA), installer guide | 100, 150 or 200 A services “possibly” need more amperage for a heat pump; under 100 A or built before 1965 “likely” do | A screening table, then a load calculation |
| ACEEE paper “Electric Panels for the 21st Century” (Energy Solutions authors; references from 2022) | Existing homes should have at least 200 A “or load sharing alternatives” | A worked NEC calculation reaching 120 A, or 99 A with two shared circuits |
| New Buildings Institute, July 2023 | “100- or 150-amp panels are enough for most homes to go all-electric” | Utility meter studies in Sacramento and PG&E territory |
| Silicon Valley Clean Energy, guide for building officials | Homes under 200 A “can often avoid service upgrades” | Smart meter data from over 22,000 California homes |
| DOE BSESC factsheet (with NBI) | No position; shows the two optional methods | The NEC’s optional calculations |
What the field data says
The New Buildings Institute describes a Sacramento comparison of one-hour peak demand over a year, in which the average all-electric home “peaked at just 12 amps more than gas-burning homes,” roughly 32 A instead of 20 A. It also describes a Home Energy Analytics study of about 22,000 PG&E homes in which “only 2% of the households peaked above 88 amps.” Silicon Valley Clean Energy’s Service Optimization Guide for Building Officials reports smart meter data from over 22,000 California homes: 86% peaked below 50 A, and nearly half below 30 A.
Why both sides can be right
- The code calculation is a worst case on paper. It counts nameplates, applies fixed demand factors and counts heating or cooling at 100%. It does not know that your range rarely runs every burner while the car charges.
- Meter data shows real coincidence. Big loads seldom overlap. But one-hour averages also smooth out short spikes, so a 15-minute peak can be higher than an hourly figure.
- California homes are not every home. A Kentucky or New York house running backup resistance heat on a cold morning can draw far more than a coastal California bungalow.
- The code decides what you can install. Meter data counts only through the measured-demand method described below, and only where the inspector accepts it.
The practical reading: a 100 A service often has real headroom, but you have to show it through a code calculation, and your equipment choices decide whether it passes. NBI concedes the edge cases: “Some homeowners, especially those with 60-amp panels, will inevitably need to increase the capacity of their electric panels.”
How the code’s load calculation for an existing home works
The National Electrical Code (NFPA 70) has a standard method and optional methods for sizing a dwelling’s service, and existing homes adding load usually use one of two optional methods. DOE’s factsheet calls them Optional Method One (measured demand, section 220.87) and Optional Method Two (the existing-dwelling calculation, section 220.83).
Section numbers here follow the editions the cited sources use, chiefly the 2020 and 2023 NEC. The NFPA publishes a new edition every few years, and states and cities adopt editions on their own schedules, sometimes with amendments. Your electrician works from the edition enforced where you live.
The existing-dwelling calculation (section 220.83)
DOE’s factsheet lays it out in six steps:
- Lighting and receptacles: 3 VA per square foot of finished floor area.
- Small-appliance and laundry circuits: 1,500 VA for each 20 A kitchen and laundry circuit, minimum three.
- Fastened-in-place appliances at nameplate: oven, cooktop, fixed microwave, dishwasher, disposal, dryer, washer, well pump, sump pump, hot tub and others.
- Apply the demand factor: add steps 1 to 3, take the first 8,000 VA at 100% and the remainder at 40%.
- Add heating or cooling at 100%: whichever is larger, heating (heat pump, air handler, backup electric heat, baseboard) or cooling. Not both.
- Divide by 240 volts and compare with the service rating.
The 40% factor is where most electrification loads land, and it is generous: a 12,000 VA range adds only 4,800 VA once the first 8,000 VA is used up. Heating gets no discount, which is why the heat pump and its backup strips usually decide the answer. ACEEE’s authors note that new homes use section 220.82, which takes the first 10,000 VA at 100%.
The measured-demand method (section 220.87)
This method replaces the estimate of what the house already uses with what it actually used. As DOE’s factsheet, ACEEE’s paper and Silicon Valley Clean Energy’s guide describe it:
- Start from the home’s maximum demand over one year, from utility data.
- If a year is not available, a recording of at least 30 days is allowed, using the highest average kilowatts held for a 15-minute interval, with seasonal loads such as heating added by measurement or calculation.
- Multiply that maximum demand by 125%.
- The 125% figure plus the new load must not exceed the service rating.
DOE’s factsheet writes it as maximum demand x 125% / 240 V = amps of existing load. ACEEE’s authors explain why it often helps: the standard lighting and plug-load figures come from square footage and assumed occupancy, and real homes often use less. The catch is that collecting the data “requires planning and resources.”
Two practical points. Silicon Valley Clean Energy’s guide describes a year of hourly data as the main route, but how your inspector treats hourly data is a local question. And a year of data from a gas-heated house does not contain the heat pump you are adding, so the heat pump goes in as new load.
How far apart the two methods can land
Example (fictional). A 1,400 sq ft house with 100 A service heats with gas and has a 3,600 VA central air conditioner. Its general loads are 4,200 VA of lighting and receptacles (1,400 x 3), 4,500 VA for three kitchen and laundry circuits (3 x 1,500) and 3,300 VA of fixed appliances (a 1,200 VA dishwasher, a 600 VA disposal and a 1,500 VA fixed microwave), for 12,000 VA.
Existing-dwelling calculation: the first 8,000 VA at 100% plus 4,000 VA at 40% (1,600 VA) is 9,600 VA. Add the air conditioner at 100%: 13,200 VA, or 55 A at 240 volts.
Measured demand: suppose a year of utility data shows a highest demand of 5.0 kW on a July afternoon. At 125%, that is 6.25 kW, or 26 A.
The measured route leaves 74 A of room for new load instead of 45 A. The real figure depends on your data and on how your electrician counts the new load.
A worked example: one house, electrified one appliance at a time
ACEEE’s paper works the existing-dwelling calculation through a 1,600 sq ft home, the authors’ figure for an average existing single-family house, adding electric appliances one at a time. It is the clearest public example of where 100 A runs out.
The starting home has no central air conditioning. Its loads total 13,968 VA: 4,800 VA of lighting and receptacles (1,600 x 3), 4,500 VA for small-appliance and laundry circuits, and nameplates for a washer, refrigerator, disposal, dishwasher and kitchen hood. The first 8,000 VA counts at 100% and the remaining 5,968 VA at 40% (2,387 VA), for 10,387 VA, or 43 A. The authors note this mixed-fuel home “could even be served by a 60A panel.” Each electric appliance then goes in, with nameplate values from Redwood Energy’s Watt Diet Calculator:
| Added load | Nameplate VA | Counted | Running total VA | Amps at 240 V |
|---|---|---|---|---|
| Starting home | 13,968 | 10,387 | 10,387 | 43 |
| Electric dryer | 5,000 | 2,000 (40%) | 12,387 | 52 |
| Induction range | 12,504 | 5,002 (40%) | 17,389 | 72 |
| Electric water heater | 5,040 | 2,016 (40%) | 19,405 | 81 |
| Level 2 EV charger | 7,200 | 2,880 (40%) | 22,285 | 93 |
| Heat pump with resistance backup | 6,500 | 6,500 (100%) | 28,785 | 120 |
Three lessons sit in that table:
- Four big appliances fit. A dryer, a range, a water heater and a 7.2 kW charger take the home from 43 to 93 A, inside 100 A.
- Heating breaks the budget. The heat pump adds 27 A by itself because heating counts at 100%; the authors say space heating “adds the most load to the panel.”
- Sharing brings it back. In Section 4C, the authors put the range and EV charger on one circuit and the water heater and dryer on another, using automatic circuit-sharing devices. That removes the charger’s 12 A and about 9 A more: 99 A.
The authors still expect a fully electrified home to default to 200 A, partly because 125 and 150 A panels were not standard builder sizes when they wrote. Their own numbers show the narrower point: with circuit sharing, this house fits.
The same calculation with different equipment choices
The equipment you pick moves the result by tens of amps, which is the most useful thing to know before you buy anything.
Example (fictional). The same 1,400 sq ft, 100 A house replaces its gas furnace and air conditioner with a heat pump and adds an electric range, a dryer, a heat pump water heater and EV charging. All nameplate figures are invented; your labels give the real ones. General loads stay at 12,000 VA, and heating replaces cooling as the larger load.
Plan A, default picks. A 12,000 VA range, a 5,000 VA resistance dryer, a 240-volt heat pump water heater with a 4,500 VA element, a 48 A EV charger (48 x 240 = 11,520 VA) and a heat pump with 10 kW backup strips, 14,200 VA for heating. Other loads: 12,000 + 12,000 + 5,000 + 4,500 + 11,520 = 45,020 VA. First 8,000 at 100%, remaining 37,020 at 40% (14,808): 22,808 VA. Add heating: 37,008 VA, or 154 A, more than even a 150 A service.
Plan B, right-sized picks. A 9,600 VA range, a 120-volt heat pump dryer at 1,800 VA, a 120-volt heat pump water heater at 1,200 VA, the EV charger set to 24 A (5,760 VA) and a heat pump sized to the heat loss with 5 kW strips, 9,200 VA for heating. Other loads: 12,000 + 9,600 + 1,800 + 1,200 + 5,760 = 30,360 VA. First 8,000 at 100%, remaining 22,360 at 40% (8,944): 16,944 VA. Add heating: 26,144 VA, or 109 A.
Plan C, Plan B plus one shared circuit. The charger shares a circuit with the range through a circuit-sharing device, so only one draws at a time and the charger drops out of the calculation, as in ACEEE’s method. Other loads: 30,360 - 5,760 = 24,600 VA. First 8,000 at 100%, remaining 16,600 at 40% (6,640): 14,640 VA. Add heating: 23,840 VA, or 99 A.
Plan C passes on paper with almost no margin. An electrician might accept it, suggest an energy management system, or run the measured-demand method; the household might still choose 150 A. None of these plans is a recommendation; they show how much the equipment list matters.
The tools that keep an all-electric home inside 100 or 150 amps
Most of the amps you can save come from five choices: the heat pump’s size and backup, lower-power appliances, lower-power EV charging, circuit sharing and listed load management. Each has a trade-off.
| Tool | How it changes the calculation | Trade-off |
|---|---|---|
| Heat pump sized to the house, smaller backup strips | Heating counts at 100%, so each kW of strips removed saves about 4 A | Backup must still cover defrost and the coldest hours |
| 120-volt heat pump water heater | A 15 A, 120-volt circuit instead of a 240-volt one | Slower recovery; tank size matters more |
| Lower-power dryer and cooking | Smaller nameplates in the 40% bucket | Product choice varies by market |
| Lower-amperage EV charging | A 16 or 24 A setting instead of 40 or 48 A | Fewer miles added per hour |
| Automatic circuit sharing | Two appliances on one circuit, one at a time | The inspector decides how it is counted |
| EV charger load management (NEC 625.42) | Charger load counts at the level the system allows | Slower charging when the house is busy |
| Energy management system or smart panel (NEC 220.70, 2023 edition) | A setpoint can stand in for the controlled loads | Must be listed and set up as permitted; not adopted everywhere |
| Measured demand (NEC 220.87) | Metered peaks replace the estimate of existing load | Needs a year of data or a 30-day recording |
Heat pumps: size and backup heat decide most of the answer
Heating counts at full nameplate, so it moves the result more than any other load. Silicon Valley Clean Energy’s guide notes that properly sized heat pump systems with inverter-driven outdoor units reduce peak electrical loads. In cold and mixed climates the bigger lever is the backup: resistance strips in the air handler. A 10 kW strip kit is about 42 A at 240 volts (10,000 / 240) on its own.
Ask the contractor for a room-by-room heat-loss calculation, and size both the heat pump and the strips to it instead of matching the old furnace. In the fictional plans above, halving the strips from 10 to 5 kW removed about 21 A from the calculation, more than any other single change, and it only works if the heat-loss calculation says the house stays warm.
Water heaters, dryers and cooking at 120 volts
Electric tank water heaters have traditionally needed a dedicated 240-volt circuit; ACEEE describes California’s energy code for new homes, which requires a dedicated 240-volt circuit of 30 to 50 A beside each gas water heater, furnace, cooktop or dryer so an electric replacement can go in later. Plug-in heat pump water heaters run at 120 volts instead. Rheem’s specification sheet for its 50-gallon ProTerra plug-in model on a dedicated circuit lists 120 volts, a minimum 15 A breaker and an average draw of 1,100 W. NBI describes the category as “rated at just 15 amps (and actually pull only 4-6 amps).” Manufacturers sell both dedicated-circuit and shared-circuit versions; the unit’s label says which you need.
The trade-off is recovery speed: a compressor-only unit reheats more slowly than a 240-volt unit with resistance elements. Silicon Valley Clean Energy’s guide calls 120-volt units appropriate for homes with lower water heating demand and notes that a larger tank can cover higher-demand days. A heat pump water heater can also heat ahead of peak hours and coast through them, as our guide to heat pump water heater scheduling explains mode by mode.
Dryers and ranges come in a wide spread of nameplate ratings, including 120-volt models; ACEEE’s example used a 5,000 VA dryer and a 12,504 VA induction range. NBI mentions 120-volt induction stoves, including one with a built-in battery, and Silicon Valley Clean Energy notes that induction cooking can often share a circuit. Compare nameplates before you buy: that number is what enters the calculation.
EV charging at lower amperage
DOE’s Alternative Fuels Data Center says Level 1 charging through a 120-volt plug assumes 1.9 kW and adds about 5 miles of range per hour, and that “most residential Level 2 chargers operate at up to 30 Amps, delivering 7.2 kW.” Level 2 equipment ranges from 2.9 to 19.2 kW. What matters is whether a lower setting covers your daily driving in the hours the car is home.
Example (fictional). The site’s example home drives 35 miles a day at 3.5 miles per kWh with 10% charging loss, so it needs 11.1 kWh from the wall daily. At 16 A on 240 volts (3.84 kW), that takes 11.1 / 3.84 = 2.9 hours. At Level 1 (1.9 kW), it takes 11.1 / 1.9 = 5.8 hours. The example rate’s off-peak window runs 10 hours, 9 p.m. to 7 a.m., so either refills the day’s driving overnight. A 48 A charger (11.52 kW) would take about an hour, speed the car does not need on an ordinary day.
The EV charging time calculator runs this arithmetic for your own miles and charger. Charger circuits have their own rule: ACEEE’s paper notes that NEC 625.41 requires overcurrent protection of at least 125% of the charger’s maximum load, so a 30 A charger needs a 40 A breaker (30 x 1.25 = 37.5, up to the next standard size). Our article on EV charger amps and panel capacity covers breaker and wire sizing for one charger circuit.
Circuit sharing: one circuit, two appliances, one at a time
An automatic circuit-sharing device, sometimes called a smart splitter, puts two 240-volt appliances on one breaker and switches power between them. In the usual design, described by ACEEE’s authors, a primary appliance can always draw power and the secondary draws only when the primary is off. Short-use appliances such as dryers and ranges pair well with interruptible loads such as water heaters and EV chargers.
New York’s installer guide lists load-sharing splitters as an alternative to an upgrade; in its example, the splitter keeps the EV charger from running while the dryer is in use. ACEEE notes that some installations need building department review. Have the electrician confirm the device is listed for the use and that the inspector will accept how it is counted.
Load management, energy management systems and smart panels
Load management measures the whole house and reduces or pauses chosen loads to hold the total below a limit.
- EV charger load management. ACEEE’s paper notes that NEC 625.42 lets the charger’s maximum load be the level an automatic load management system allows, so a charger can be added without counting its full rating.
- Energy management systems. Silicon Valley Clean Energy’s guide describes section 220.70 of the 2023 NEC, which sets rules for an energy management system setpoint, the maximum load the system will allow; that single value can stand in for the controlled loads. The guide notes California had not yet adopted those sections, while several other jurisdictions were adopting them.
- Smart panels and smart breakers. DOE’s factsheet and New York’s guide list them as ways to manage a home’s peak demand. Some act as listed energy management systems; others only monitor. The listing and setup decide whether they count.
What does not count: a schedule in an app. A timer that charges the car at 1 a.m. lowers the chance of overlap, but the calculation credits only listed equipment installed as load management.
Solar and batteries are a separate busbar question
Solar and battery inverters push current back into the panel, and the code limits how much a busbar can receive from the utility and the inverter together. ACEEE’s authors note that solar can connect on the supply side, ahead of the main breaker, and that the 2020 NEC added section 705.13, which lets power control systems cap solar and storage output so more can connect without an upgrade. They also cite an estimate that panel upgrades happen in 20 to 30% of rooftop solar installations. If solar or a battery is planned, raise it before you finalize the appliance list; our article on whole-home versus partial backup explains how backup circuits change the wiring.
When an upgrade is still the right call
An upgrade to 150 or 200 amps is the better choice when the calculation fails with reasonable equipment, when the service is too small or unsafe to start with, or when the work is happening anyway.
- The service is below 100 A or the panel is old. New York’s guide puts services under 100 A and homes built before 1965 in the “likely needs more amperage” group, and lists fuse box panels among the cases for a service upgrade. NBI agrees that 60 A homes will need more capacity.
- The calculation fails with right-sized equipment. Large homes, two-EV households with long commutes and cold-climate homes with large backup heat can exceed 100 A after every reasonable choice.
- There is no physical space. New York’s guide notes that full 100 A panels can sometimes use load-sharing devices, tandem breakers or a subpanel, but calls a service upgrade best practice.
- Solar and storage exceed what the busbar can take.
- The service or panel needs replacing anyway, for damage, an addition or rewiring, so the extra cost of going larger may be small.
- You want room for loads not yet chosen, such as a second EV or a hot tub.
What an upgrade costs and how long it takes
Published ranges are wide. ACEEE’s paper cites a Pecan Street estimate of $2,000 to $5,000 for a panel upgrade, taking weeks to months. NBI puts the process at “$3,000 to $25,000” and “2 to 18 months.” The spread comes from the utility side: ACEEE reports that a PG&E and SDG&E study found some customers paid more than $30,000 when utility infrastructure also needed work, and it cites Sacramento Municipal Utility District estimates of $4,800 to $6,700 for a service transformer, plus as much as $8,000 per home if the service lines need upgrading.
Who pays for utility-side work depends on the utility’s rules, so ask early. The federal energy efficient home improvement credit (section 25C), which had covered heat pumps, heat pump water heaters and panelboards of 200 A or more, applied only to property placed in service before the end of 2025, according to the IRS. Check state and utility programs instead, and ask a tax professional how any program applies to you.
If an upgrade is needed, ask whether 150 A would cover your plan and whether the utility’s service drop and transformer can stay as they are. In some homes that decides whether the utility side needs work at all.
How daily scheduling relates to a tight service
A load calculation answers whether the service can legally carry everything; a daily schedule decides how often the big loads actually overlap. The second never replaces the first, but it still matters on a tight service:
- Spread the big loads. EV charging at 1 a.m., water heating in the early off-peak hours and pre-heating before an evening peak keep the largest loads apart.
- Rate windows push loads together. On a time-of-use rate, every timer wants the first off-peak minute. A car, a water heater and a dishwasher all starting at 9 p.m. is exactly the coincidence a calculation assumed away. Stagger the start times.
- Winter mornings are the hard hours. Heat pump recovery after a night setback, backup strips, showers and breakfast pile up together. A smaller setback or an earlier, slower recovery keeps the strips off.
Culni is software that reads a home’s electricity rate and runs one daily schedule across rooftop solar, a home battery, EV charging and flexible loads such as heat pumps and water heaters, then checks the result against the bill each month. It works inside the limits the electrician sets: it does not change wiring, breakers, charger current limits set at installation or any energy management setpoint, and a schedule is not a substitute for listed load management. The devices page explains how each device’s control path is checked home by home, and the all-electric homes page shows how heat pumps, induction cooking and heat pump water heaters fit into one schedule.
Questions to ask an electrician before you decide
Bring a list of what you have and what you plan to add, with nameplate ratings, and ask:
- What is my service rating, and which part limits it? Main breaker, busbar, service conductors or meter base.
- Which calculation method and which NEC edition will you use?
- Can we use measured demand? Will the utility supply a year of interval data, and will the inspector accept hourly data or want 15-minute data or a 30-day recording?
- What does the calculation show for my full plan, not just the next appliance?
- What backup heat does the heat-loss calculation call for, and what does the calculation show with a smaller kit?
- Would 120-volt equipment change the result?
- What EV charging current fits? Then check it against your driving.
- Which sharing or load management equipment would you install, is it listed for this use, and how will the inspector count it?
- If an upgrade is needed, would 150 A do, and does the utility side need work?
- What margin are you comfortable with? DOE’s factsheet says electricians recommend that the load never exceed 80 percent of service capacity; ask how that applies to a calculation that lands near the limit.
If a solar, battery or charger installer is involved, ask them too; the installers page explains how Culni works with installers after commissioning.
What to do next
- List every large load, present and planned. The home energy inventory worksheet records each device, its nameplate and its connection method. Photograph each nameplate.
- Read your service rating from the main breaker, the panel label and the meter base. Leave the panel cover on; opening it is the electrician’s job.
- Ask the utility for interval data. A year of 15-minute or hourly data supports the measured-demand method.
- Rank the low-cost choices. Strip size, 120-volt water heating, a lower charging current and a sharing device often cost less than new service.
- Get the calculation in writing, with method, edition and result in amps for the full plan.
- Decide on an upgrade with numbers in hand. If the plan fits, keep your amps. If it does not, or fits with no margin and more loads are coming, price 150 and 200 A including the utility side.