What amp EV charger do I need: how the 125% rule sets the circuit, why the car's onboard charger caps speed, and when load management avoids a panel upgrade.

Reader question
What charger amperage and circuit does my home need, and can I install it without upgrading my electrical panel or service?
A single old grapevine trunk climbs a wooden trellis at dusk and divides into two arms, one heavy with ripe clusters and the other trimmed back with only a few.

Size the charger to the energy your car needs inside its charging window, then size the circuit at 125% of the charger’s current: a 32-amp charger goes on a 40-amp circuit, 40 amps on 50, and 48 amps on a 60-amp circuit, which is usually hardwired. In an eight-hour overnight window, 32 amps at 240 volts adds about 198 miles for a car that uses 31 kWh per 100 miles, so 40 or 48 amps helps only when the car’s onboard charger accepts it and you need that much energy in fewer hours. Whether your panel and service can carry the new circuit is settled by a load calculation; when the answer is no, a lower charger setting, a shared circuit or a load management system recognized by the electrical code can often avoid a service upgrade.

This article explains that sizing decision. The step-by-step install list is in the EV charger installation checklist, and whether you need a 240-volt charger at all is in Level 1 vs Level 2 home charging. Code requirements differ by edition and by what your state or city has adopted, so treat the code sections below as orientation: a licensed electrician and the local inspector decide what your installation needs.

The sizing chain: car, charger, circuit, panel and service

Five links decide how fast a car charges at home and whether the house can supply it: the car’s onboard charger, the charger on the wall, the branch circuit, the panel and the service from the utility. The slowest link sets the charging speed, and the most loaded link decides whether you need an upgrade.

  • The onboard charger is inside the car. It converts AC from the wall into DC for the battery, and its rating in kW is the most AC power the car will accept. The DOE’s Alternative Fuels Data Center (AFDC) lists the vehicle’s internal charger capacity among the factors that set charging time.
  • The charger, which the code calls electric vehicle supply equipment (EVSE), is the wall unit or portable unit between the circuit and the car’s charge port. Its current rating, or the lower setting it is installed at, is what the circuit is sized for.
  • The branch circuit is the breaker and the wires from the panel to the charger or its outlet. It is sized for the charger’s current.
  • The panel holds the breakers. A 240-volt charger circuit needs space for a two-pole breaker; the EPA’s quick screen below looks for two empty slots.
  • The service is the utility connection and the main breaker, rated for example at 100, 150 or 200 amps at 240 volts. Its rating is the ceiling for everything in the house running at once.

A useful way to see the scale: multiply amps by 240 volts. A 100-amp service is 24 kW, a 150-amp service is 36 kW and a 200-amp service is 48 kW. A 48-amp charger draws 11.52 kW, nearly half of a 100-amp service on its own.

Charger power compared with the capacity of a home's electrical serviceHorizontal bars in kW at 240 volts. A 200-amp service is 48 kW, 150-amp is 36 kW and 100-amp is 24 kW. A 48-amp charger draws 11.52 kW, 40 amps 9.6 kW, 32 amps 7.68 kW and 16 amps 3.84 kW. kW at 240 volts: the whole service and one charger 200 A service 48 kW 150 A service 36 kW 100 A service 24 kW 48 A charger 11.52 kW 40 A charger 9.6 kW 32 A charger 7.68 kW 16 A charger 3.84 kW 0 12 24 36 48
Arithmetic: kW = amps x 240 volts / 1,000. Service ratings are the main breaker's rating, not the load a home actually draws; a load calculation decides what is available for a charger. Charger currents are the charger's continuous draw.

How the 125% rule sets the breaker

EV charging is a continuous load, so the circuit is sized at 125% of the charger’s current. The AFDC’s home charging page notes that “EV charging infrastructure is considered a continuous load by the National Electrical Code (NEC)”, and the EPA’s home charging guide puts it in plain numbers: “be sure your circuit breaker is sized at least 125% of the charger it is attached to. As an example, a 40-amp Level 2 charger would require a dedicated 50-amp electrical circuit,” citing NEC 625.41.

Run the rule the other way and you get the largest charger setting a circuit allows: divide the breaker rating by 1.25. That is where the common pairings come from.

Charger currentCircuit at 125%Power at 240 VMiles per hour of chargingMiles in an 8-hour windowHours for a 35-mile day
16 A20 A3.84 kW12992.8
24 A30 A5.76 kW191491.9
30 A40 A (AFDC)7.2 kW231861.5
32 A40 A7.68 kW251981.4
40 A50 A9.6 kW312481.1
48 A60 A11.52 kW372970.9
80 A100 A19.2 kW624950.6
Circuit = charger current x 1.25 (EPA, citing NEC 625.41); the AFDC pairs a 30-amp, 7.2 kW unit with a dedicated 40-amp circuit and puts Level 2 equipment between 2.9 and 19.2 kW. Miles use 0.31 kWh per mile (2026 Chevrolet Equinox EV FWD, 31 kWh per 100 miles, fueleconomy.gov); a 35-mile day needs 10.85 kWh. Every row assumes the car's onboard charger accepts that power. Checked November 2026.

The arithmetic behind each row: amps x 240 volts = watts; watts / 1,000 = kW; kW / 0.31 = miles per hour of charging; kW x 8 / 0.31 = miles in eight hours; 10.85 kWh / kW = hours for a 35-mile day.

Plug-in or hardwired

A plug-in charger uses a 240-volt receptacle; a hardwired charger is connected directly to the circuit. The EPA notes that “NEMA 14-50 outlets are a common choice for Level 2 EV chargers” and that “For chargers rated at 48-Amps or higher, they are usually required to be hardwired instead of plugging them into an outlet.” A NEMA 14-50 outlet is on a 50-amp circuit, so by the 125% rule the most a plug-in charger can draw on it is 50 / 1.25 = 40 amps.

The code’s list of permitted receptacles changes between editions. In the second revisions NFPA’s Code-Making Panel 12 adopted for the 2023 edition of NFPA 70, sections 625.44(A) and (B) were “revised to allow 14-60R receptacles”, a 60-amp type, and section 625.54 requires that “All receptacles installed for the connection of electric vehicle charging shall have ground-fault circuit-interrupter protection for personnel”. Your electrician applies the edition your jurisdiction has adopted, which may be older or newer.

Other circuit details the electrician settles

The wire size follows the breaker and the length of the run, the conduit or cable type follows the location, and a charger rated above 60 amps needs a disconnecting means: the same 2023 revisions require one “For EVSE and WPTE rated more than 60 amperes or more than 150 volts to ground”, in a readily accessible location and lockable open. A charger at 48 amps or less on a standard 120/240-volt residential circuit is below both thresholds, but the electrician confirms that against the equipment and the code in force. Wire gauges and terminal ratings are the electrician’s decision and are not given here.

At 208 volts the same amps deliver less

The kW figures above assume 240 volts, which the AFDC calls typical for residential Level 2. Some buildings supply 208 volts instead, which the AFDC calls typical in commercial applications, and the same current then delivers less power: 32 amps x 208 volts = 6.66 kW instead of 7.68 kW, and 48 amps x 208 volts = 9.98 kW instead of 11.52 kW. If your building is on 208 volts, rerun the window arithmetic with those figures before you pick a current.

Why 48 amps can be wasted: the car’s onboard charger

A charger can only offer current; the car decides how much it takes, up to its onboard charger’s limit. A 48-amp charger on a car whose onboard charger tops out at 32 amps charges exactly as fast as a 32-amp charger, on a circuit that cost more to install.

Onboard charger ratings differ even within one model. fueleconomy.gov lists the 2026 Chevrolet Equinox EV AWD in two versions, one with an 11 kW charger and one with a 19 kW charger, and lists the Silverado EV, Sierra EV and several Cadillac models the same way. Convert the rating to amps at 240 volts to see what it means for your charger choice: 11,000 watts / 240 volts = 45.8 amps, so an 11 kW car can use most of a 48-amp charger’s output, while a car with a 7.2 kW onboard charger would take only 30 amps from any charger.

Find your car’s figure in the owner’s manual or the manufacturer’s specification sheet, listed as maximum AC charging power in kW. Then use the smaller of two numbers: the car’s limit, or the energy your window needs.

How many amps your window actually needs

The charger only has to deliver your daily kWh inside your off-peak window, with a margin. Divide the kWh by the hours, then divide by 240 volts to get the minimum current.

  1. Daily kWh. Miles x kWh per mile. 35 miles x 0.31 = 10.85 kWh.
  2. Window hours. The off-peak hours between plug-in and departure. On LG&E’s RTOD-Energy, a winter weekday gives 10 p.m. to 6 a.m., eight hours (tariff Sheet No. 6.1, rating periods in Eastern Standard Time).
  3. Minimum power. 10.85 kWh / 8 hours = 1.36 kW.
  4. Minimum current at 240 volts. 1,360 watts / 240 volts = 5.7 amps. Any Level 2 setting covers this day.
  5. Check the hard day. A 200-mile day trip at 0.31 kWh per mile needs 62 kWh; in eight hours that is 7.75 kW, or 32.3 amps. A 32-amp charger delivers 7.68 x 8 = 61.4 kWh, about 198 miles, essentially the whole trip in one night.

For a single car charging in an eight-hour window, the window math asks for more than 32 amps only on days above about 198 miles. The other cases that call for more current are specific: two cars sharing one charger in the same window, a short window such as the seven and a half hours some rates leave before a 7:30 a.m. departure, very high daily mileage, or a large vehicle with a big battery and a high onboard charger rating.

Example (fictional). The example home’s car drives 35 miles a day at 3.5 miles per kWh with a 10% charging loss, so it needs 11.1 kWh from the wall each day. Its Level 2 charger runs at 7.2 kW (30 amps, the AFDC’s typical residential figure) and finishes in 11.1 / 7.2 = 1.5 hours, inside the example rate’s ten-hour off-peak window from 9 p.m. to 7 a.m. At 16 amps (3.84 kW) the same charge would take 11.1 / 3.84 = 2.9 hours, still well inside the window. For this fictional household, a 48-amp circuit would buy charging speed the schedule never uses. The example home page shows the charge running from 1 to 3 a.m.

Can your panel carry it? The load calculation

Whether a new charger fits is not decided by adding its breaker to the panel’s label. An electrician performs a load calculation that estimates the home’s demand under the code’s rules and checks that the demand plus the charger stays within the service rating. The EPA lists this first among the electrician’s jobs: “Perform a load calculation: An electrician can determine if your existing electrical panel can handle an EV charger, or if you might need upgrades.”

The EPA also gives a quick screen. You can often find your service rating on the main breaker, “typically the largest switch at the top” of the main panel. “If your home has at least 200-Amps and two empty slots for a double-pole circuit breaker in your panel, you likely have capacity for a Level 2 charger. Even 100-Amp service is often sufficient, depending on how much electricity your other appliances use.” The same page notes that homes built around the 1980s or later tend to have 200 amps or more.

Two ways to calculate the existing load

The existing load can be calculated from the home’s equipment or, where the measured method applies, taken from the utility’s records. Which method your jurisdiction accepts, and how it is documented, is up to the electrician and the permit office.

  • Calculated. The electrician lists the home’s loads and applies the demand factors in the code’s dwelling calculation methods. This counts installed equipment rather than the use the meter recorded.
  • Measured. NEC section 220.87, as described in the City of Tega Cay, South Carolina, residential EV charging permit guide, uses “actual maximum demand data” covering a one-year period, and requires that the maximum demand at 125% plus the new load not exceed what the service or feeder can carry. That guide cites the 2020 edition of the NEC.

The measured method can help an older home because it uses the peaks the meter actually recorded rather than an estimate built from the equipment list. If your utility can provide a year of interval data, ask your electrician whether the measured method is an option where you live.

Read your own interval data before the electrician visits

If you have a smart meter, you can get a first look at your peaks yourself. The EIA defines advanced metering infrastructure as meters that “measure and record electricity usage at a minimum of hourly intervals” and provide the data to the utility and the customer at least once a day (EIA FAQ). Download a year of hourly use from your utility account and find the highest hour.

An hour’s kWh equals that hour’s average kW. Suppose your highest hour shows 8.4 kWh: that is an average of 8.4 kW, or 8,400 / 240 = 35 amps at 240 volts. Peaks inside the hour run higher than the hourly average, so treat this as a lower bound, not a substitute for the data the code calculation uses. It still tells you whether you are near your service rating or far from it before anyone opens the panel, and your electrician decides what data qualifies for the measured method.

A worked check on a 100-amp service

The numbers below are hypothetical. They show how the measured method works and why the way the charger is counted matters.

Suppose a home has a 100-amp, 240-volt service and the utility’s data shows a highest demand over the past year equal to 40 amps. At 125%, that existing load counts as 50 amps, which leaves 50 amps for the charger.

New charger Counted at its rating Total Counted at 125% Total
32 A 32 A 82 A, fits within 100 A 40 A 90 A, fits
40 A 40 A 90 A, fits 50 A 100 A, at the limit
48 A 48 A 98 A, fits with 2 A to spare 60 A 110 A, does not fit

Whether the new load enters at its rating or at 125% is something the electrician and inspector settle under the code your jurisdiction has adopted. The table shows why it matters at 48 amps and barely matters at 32. It also shows that the 32-amp choice, which covers about 198 miles in an eight-hour window, fits on this hypothetical 100-amp service under either convention.

What a permit office may ask for

Permit requirements are local. As one example, Tega Cay’s guide for chargers fed from an existing service asks for the contractor’s license information, a one-line diagram of the raceways, conductors and overcurrent protection, an updated panel schedule including the demand load for the new charger circuit, a site plan, the charger’s specifications with UL 2202 and UL 2594 listings, and the 220.87 existing load calculation. The AFDC notes that “In many areas, a site installation plan must be submitted to the permitting authority for approval before installation.”

Three homes run through the sizing chain

The same chain gives different answers in different houses. The three homes below are hypothetical, built on real EPA ratings and an eight-hour winter window like LG&E’s RTOD-Energy, to show how the links interact.

Home 1: a 200-amp service and a long commute. Suppose a household drives a 2026 Chevrolet Equinox EV AWD with the 11 kW charger, which fueleconomy.gov rates at 33 kWh per 100 miles, for 60 miles a day. In mild weather it needs 60 x 0.33 = 19.8 kWh; on a 20°F day, with the roughly 39% drop in fuel economy that fueleconomy.gov reports, about 19.8 / 0.61 = 32.5 kWh. A 32-amp charger delivers that in 32.5 / 7.68 = 4.2 hours, inside the eight-hour window. A 48-amp charger would be capped near 11 kW by the car and finish in about 3.0 hours, which the window does not need. If the load calculation passes, 32 or 40 amps covers this household; 48 amps buys only speed outside the schedule.

Home 2: a 100-amp service in an older house. Suppose a year of utility data shows a highest demand equal to 55 amps. At 125%, that counts as 68.75 amps, leaving 31.25 amps on a 100-amp service. If the inspector counts the charger at its rating, a 30-amp setting fits; if at 125%, the most that fits is 31.25 / 1.25 = 25 amps, so a 24-amp setting on a 30-amp circuit. At 24 amps the charger delivers 5.76 x 8 = 46.1 kWh in the window, about 149 miles at 0.31 kWh per mile. A 35-mile day in cold weather, about 17.8 kWh, takes 17.8 / 5.76 = 3.1 hours. This home charges fine on a capped charger, and an energy management system could allow a higher setting under 625.42(A) if the inspector accepts it.

Home 3: two cars on a 150-amp service. Suppose one car drives 35 miles and the other 50 miles a day, both at 0.31 kWh per mile, so the house needs 10.85 + 15.5 = 26.35 kWh a night, or about 43.2 kWh on a 20°F day. Two chargers sharing one 40-amp circuit can draw 32 amps between them, 7.68 kW, which adds 61.4 kWh in eight hours: more than the cold-day need, on one breaker instead of two. If a heat pump is also planned, this is the household that should price a service upgrade alongside the shared circuit, because the next large load will need room too.

None of these answers came from the biggest charger on the shelf. Each came from the car’s limit, the miles, the window and the load calculation, in that order.

The code routes around a service upgrade

When the load calculation says the full-size charger does not fit, the code offers ways to cap the charger’s draw instead of enlarging the service. The idea is the same in each: the service and feeder are sized for the maximum the controls allow, not for the charger’s nameplate.

The rule sits in NEC section 625.42. A 2021 Washington State Building Code Council document quotes the section as it read then: “Electric vehicle charging loads shall be considered to be continuous loads for the purposes of this article. Service and feeder shall be sized in accordance with the product rating. Where an automatic load management system is used, the maximum equipment load on a service and feeder shall be the maximum load permitted by the automatic load management system.” In the 2023 edition’s second revisions, 625.42 sizes the service and feeder by the product ratings “unless the overall rating of the installation can be limited through controls as permitted by 625.42(A) or (B)”. Section numbers move between editions, so ask your electrician which ones apply where you live.

Route 1: set the charger to a lower current

A Level 2 charger with an adjustable current setting can be set lower at installation, and the code recognizes that setting when access to it is restricted. Under 625.42(B) in the 2023 revisions, EVSE “with restricted access to an ampere adjusting means shall be permitted to have ampere ratings that are equal to the adjusted current setting”, and “Sizing the service and feeder to match the adjusting means shall be permitted.” The adjusted rating has to appear on the rating label.

Restricted access means at least one of: a cover or door that needs a tool to open, locked doors accessible only to qualified personnel, password-protected commissioning software accessible only to qualified personnel, or commissioning software that returns to a factory setting that is the lowest in the range. The practical result: a charger capable of 48 amps can be installed at 32 amps on a 40-amp circuit, and the service calculation counts it at 32.

Route 2: two chargers on one circuit

Two cars do not always need two full circuits. In the 2023 revisions, 625.40 requires an individual branch circuit for each outlet supplying EVSE “greater than 16 amperes or 120 volts”, with an exception that lets branch circuits feed multiple EVSEs when load is managed as permitted by 625.42(A) or (B). The EPA lists “Sharing power intelligently with other chargers or household appliances” among the features of more advanced chargers.

Suppose two chargers share one 40-amp circuit. Together they may draw 32 amps of continuous current, for example 16 amps each when both cars charge and up to 32 for one when the other is full; how the share is split depends on the equipment. On an overnight window, 16 amps for eight hours is still 3.84 x 8 = 30.7 kWh per car, about 99 miles at 0.31 kWh per mile.

Route 3: an energy management system that watches the service

An energy management system (EMS) used for this job measures the home’s total load and lowers the charger’s current when the house approaches a limit. Under 625.42(A) in the 2023 revisions, “Where an EMS in accordance with 750.30 provides load management of EVSE, the maximum equipment load on a service and feeder shall be the maximum load permitted by the EMS.” The EMS may be “integral to one piece of equipment or integral to a listed system consisting of one piece of equipment”, and equipment with integral load management control has to be marked to show it.

The Washington council’s document defines the two related terms. An automatic load management system is “A system designed to manage load across one or more Electric Vehicle Supply Equipment (EVSE) to share electrical capacity and/or automatically manage power at each connection point.” An energy management system is “A system consisting of any of the following: a monitor(s), communications equipment, a controller(s), a timer(s), or other device(s) that monitors and /or controls an electrical load or a power production or storage source.” For parking with many chargers, the same document shows the idea at scale: a load management system may reduce the capacity each space needs, as long as each charging station still receives at least 3.3 kW when all run at once.

Following that definition, a home EMS can be a monitor and controller built into the charger, or a separate listed system that measures the service and signals the charger. The devices page describes device categories, including chargers and smart panels, and how a connection to them is checked.

Route 4: share a circuit with another large load

A circuit-sharing device lets the charger and another large load, such as a dryer, take turns on one circuit, so the panel does not need a new breaker. The EPA suggests asking “your electrician about load management or circuit-sharing systems: These technologies can balance electricity use between your EV charger and other appliances, preventing overloads and maximizing your home’s existing electrical capacity.” On a time-of-use rate the charger runs in the overnight window, so the two loads compete only if the dryer also runs overnight.

Route 5: upgrade the service

An upgrade is the right answer when the load calculation fails even with a capped charger, or when more large loads are coming. The EPA’s advice is to “Consider potential future electrical needs if you decide to upgrade capacity: Plan for scenarios like charging multiple EVs or transitioning from gas to electric appliances (such as heat pumps)”. A service upgrade involves the utility as well as the electrician, because the utility supplies the service connection and the meter. Whether a whole house can go electric on its existing service is the subject of the 100-amp panel article.

Decision table: lower setting, shared circuit, load management or upgrade

Bring this table to the conversation with your electrician once you know your daily kWh, your window hours, your car’s onboard charger rating and the result of the load calculation.

SituationOption to price firstWhat it does to chargingCode basis to confirm
The load calculation passes with room to spareA dedicated circuit sized at 125% of the charger's current, up to the car's onboard limitFull speed whenever the car chargesThe 125% rule for continuous EV loads
The full-size charger fails the calculation, but a smaller one passesSet the charger to a lower current with restricted accessSlower; check that it still fits the off-peak window625.42(B) adjustable settings in the 2023 edition
Two EVs, limited panel space or capacityTwo chargers sharing one circuitEach car gets a share when both charge625.40 exception with load management
The house occasionally runs large loads together and the charger would push it overAn energy management system that watches the serviceFull speed except while the house is busy625.42(A) and 750.30 in the 2023 edition
No space for a new breaker, and a dryer circuit is near the parking spotA circuit-sharing device between the dryer and the chargerThe two loads take turnsThe device's listing and local acceptance
The calculation fails even with a capped charger, or heat pumps and a second EV are plannedA service upgradeFull capacity for current and future loadsUtility service requirements and the local permit
Options and code references from the EPA home charging guide, the NFPA 70 (2023 edition) Code-Making Panel 12 second revisions and the Washington State Building Code Council's load management examples. Section numbers vary by edition; a licensed electrician and the local inspector decide. Checked November 2026.

What load management means for charging on a time-of-use rate

On a time-of-use rate, a scheduled charger runs in the overnight window, so the cap matters only on nights when other large loads run in the same hours. Where it does, the cost is time, and you can check that time against the window.

Suppose an energy management system halves a 32-amp charger to 16 amps for one hour while a dryer and a water heater run late in the evening. The charger loses (32 minus 16) x 240 volts x 1 hour = 3.84 kWh in that hour, about 12 miles at 0.31 kWh per mile, which it can make up later in an eight-hour window that has room for 198 miles. The more useful question is whether the household’s heavy evening loads run before or inside the window; a charger scheduled to start after them meets less competition.

When demand charges are in play

Some residential rates add a charge per kW of peak demand on top of the energy charge. LG&E’s RTOD-Demand is one: its time-of-day page lists a peak demand charge per kW. On a rate like that, the charger’s current setting and its start time both affect the bill, because a 48-amp charger running alongside an oven sets a higher demand reading than a 32-amp charger running after midnight. The residential demand charges article explains how those charges are measured.

Scheduling and the energy management system are separate jobs

An energy management system protects the service; it does not choose the cheapest hours. A charging schedule picks the hours; it does not watch the service. A household that needs both sets the schedule in the car or the charger and lets the EMS cap the current whenever the house is busy. If both the car and the charger have timers, use one of them, so they do not block each other.

Common mistakes when sizing a home charger

These errors are easy to make, and each one either pays for capacity the car cannot use or pushes a household toward an upgrade it may not need.

  • Buying the largest charger first. A 48-amp unit on a car that accepts 7.2 kW charges at 7.2 kW.
  • Reading the breaker as the charger’s current. A 50-amp breaker supports a 40-amp charger, not a 50-amp one.
  • Assuming a 100-amp service rules out Level 2. The EPA says “Even 100-Amp service is often sufficient, depending on how much electricity your other appliances use.” The load calculation decides.
  • Assuming a 200-amp service always has room. The EPA’s screen also needs “two empty slots for a double-pole circuit breaker”.
  • Sizing for a full battery every night. The window needs the day’s kWh, not a full charge from empty.
  • Skipping the setting lock. A lower current setting counts for the service calculation only when access to it is restricted, as 625.42(B) describes.
  • Treating load management as a schedule. An EMS protects the service; a schedule picks the cheap hours. A home on a time-of-use rate that needs load management uses both.

Questions to settle with your electrician

These questions turn the sizing chain into decisions. Write the answers on the EV charger installation checklist so they travel with the permit.

  1. What is my service rating, and what does the load calculation show? Ask which method was used, calculated or measured, and whether a year of utility data is available for the measured method.
  2. Is there space for a two-pole breaker? If not, ask about circuit-sharing devices or a subpanel, and what each would need.
  3. What is my car’s maximum AC charging power? Bring the owner’s manual figure; there is no reason to wire for more.
  4. What current does my window need? Bring your daily miles, your car’s kWh per mile and your off-peak hours.
  5. Plug-in or hardwired? A NEMA 14-50 outlet limits the charger to 40 amps; higher currents are usually hardwired.
  6. Can the charger’s current be set and locked at installation? If the full rating does not fit, a restricted setting may.
  7. Do we need load management, and which kind? A charger with built-in sensors, a separate controller, a smart panel or a circuit-sharing device.
  8. Which code edition applies, and what will the permit office ask for? Requirements for GFCI protection, disconnects and documentation follow the adopted edition.
  9. Would a service upgrade make sense anyway? If heat pumps or a second EV are planned, price the upgrade alongside the workaround.

What to do next

Start with the car and the window, then let the electrician check the house. A short sequence keeps the decision in order:

  • Find your car’s maximum AC charging power and its kWh per 100 miles.
  • Count your off-peak hours between plug-in and departure for a winter weekday and a summer weekday.
  • Work out the current your hardest regular day needs, and compare it with the 16, 32, 40 and 48 amp rows above.
  • Ask a licensed electrician for a load calculation and, if the full-size charger does not fit, for prices on a lower setting, a shared circuit, an energy management system and a service upgrade.
  • Set one charging schedule inside your off-peak window after installation.

Culni does not sell or install chargers and does not change wiring; electricians decide the circuit and the inspector approves it. Electricians who install chargers can see how Culni works with them after commissioning on the installers page. Once the charger is in, Culni’s EV charging schedule fits the charge into the cheapest hours that still have the car ready by departure, at whatever current the installation allows, where a control path is confirmed for your home. To have your rate, your car and your charging window worked through together, send your rate plan, a recent bill and your device list.

TodayYour turn

Want this worked out for your home?

Send your utility and rate plan, one recent bill and the devices you have or plan. We reply with a written home energy plan and every assumption behind it.

Remote. No site visit needed.