Your rate schedule is the tariff sheet your utility files with its state regulator, and the rate name printed on your bill tells you which one applies. You can find it on the utility’s rates page or in the state commission’s tariff library. To turn it into the price you pay per kWh, start with the energy charge for each rating period, add the per-kWh adjustment factors, scale by any percentage riders, and keep the daily or monthly customer charge separate, since it does not change with how much you use.
This guide reads one real document from top to bottom: Louisville Gas and Electric’s Rate RS, the standard residential rate in LG&E’s tariff on file with the Kentucky Public Service Commission (PSC), as checked in November 2026. Other utilities use other names and layouts, but the same parts recur in the California, North Carolina and Washington documents compared along the way. All prices are base charges as published, before adjustment clauses and taxes, unless a section says otherwise.
Where to find your rate schedule
Start with your bill, then go to the document the bill is based on. The bill names your rate schedule; the tariff sets every price on it. A tariff, in the words of Kentucky’s tariff regulation, is “the schedules of a utility’s rates, charges, regulations, rules, tolls, terms, and conditions of service over which the commission has jurisdiction” (807 KAR 5:011, Section 1).
| Where to look | What you get | Limits |
|---|---|---|
| Your bill | The rate schedule name or code, the billing days, the kWh, and each charge as billed | Shows the result, not the rules; rider names may be abbreviated |
| The utility’s rates page | A summary of each rate, sometimes the full tariff PDF | Summaries can lag behind the filed tariff |
| The state commission’s tariff library | The tariff as filed and in effect, with issue and effective dates | Long documents written for regulators |
| The OpenEI Utility Rate Database | Rate structures for over 3,700 US utilities in one format | Each record shows its last update; only a subset is refreshed every year |
| The rate case docket | Orders that set the prices, and the reasons | Hundreds of filings per case |
In Kentucky, the regulation requires a utility with a website to post its current tariff there or link to the copy on the PSC’s site (807 KAR 5:011, Section 2). LG&E’s full tariff is in the PSC tariff library as one PDF of about 200 pages; you need perhaps ten of them.
The OpenEI Utility Rate Database, maintained by the National Laboratory of the Rockies with Department of Energy funding, is the closest thing to a national rate library. It describes itself as “a free storehouse of rate structure information” covering more than 3,700 utilities and says it updates rates every year for about 150 utilities that together serve 70% of US electricity load. It is a good place to see how a rate is structured. It is not the legal record, and EIA, the federal statistics agency, does not fill the gap: it says it does not collect or publish rates, tariffs or demand charges.
Why the filed tariff beats the summary page
Summary pages are updated on their own schedule, not when the tariff changes. When we checked in November 2026, LG&E and KU’s time-of-day rate page still showed LG&E RTOD-Energy prices of $0.09177 off-peak and $0.19172 on-peak, with a daily charge of $0.47 in one table and $0.45 in another. The tariff sheet in effect since September 1, 2026 says $0.09312, $0.19307 and $0.48. The differences are small per kWh, but a savings estimate built on the web page would be wrong from the first line. Use the summary to learn the shape of a rate and the tariff for its numbers.
How a tariff book is organized
A tariff book is a set of numbered sheets, grouped into sections, with an index at the front. LG&E’s book, P.S.C. Electric No. 14, follows a layout many utilities use:
| Section | What it contains | Residential examples (sheet number) |
|---|---|---|
| Index | Every rate, rider and term with its sheet number | General Index (Sheets 1 and 1.1) |
| 1. Standard rate schedules | The rates a customer takes service under | RS (5), RTOD-Energy (6), RTOD-Demand (7) |
| 2. Riders to standard rate schedules | Optional add-ons that change how a standard rate applies | NMS-1 (57) and NMS-2 (58) net metering, EVSE-R (75) |
| 3. Pilot programs | Trial rates and programs | Listed by name |
| 4. Adjustment clauses | Charges added to every bill under the listed rates | Fuel adjustment (85), DSM (86), environmental surcharge (87), school tax (92) and others |
| 5. Terms and conditions | Billing, deposits, budget billing, rate choice, bill format | Billing (101), Budget Payment Plan (103), Bill Format (105) |
One naming trap: in LG&E’s book, “riders” are optional schedules such as net metering, and the charges stacked onto every bill are “adjustment clauses.” Many utilities and most people call both “riders,” and the North Carolina Public Staff’s bill guide lumps the add-on charges together as a “Summary of Rider Adjustments” on Duke Energy bills. Read the index to see which word your utility uses.
The terms and conditions matter more than they look. LG&E’s billing terms say that “it is at all times Customer’s responsibility to choose between optional rates” (Sheet No. 101.2), and that a change from one rate to another takes effect “with the first full billing period” after the request. The utility will not move you to a cheaper optional rate on its own; reading the schedule is how you find out whether one exists.
Billing terms worth reading once
The billing sheets answer questions the rate section does not. LG&E’s Billing terms (Sheet No. 101) say that data collected remotely from smart meters counts as a meter reading, and that when the company cannot read a meter, “Customer may be billed on an estimated basis,” with the bill adjusted once the meter is read. For opening and closing bills covering fewer than 30 days, “any demand or monthly charges” are prorated by the number of days. The late payment terms on Rate RS (Sheet No. 5.1) add a 3% charge on the current month’s charges if payment arrives after the due date, and waive one late charge every 12 months for customers in good standing.
None of this changes the price of a kWh, but it explains lines that otherwise look like errors: an estimated bill followed by a correction, a short first bill, or a late charge that appears one month and not the next.
Reading the header: which version applies, and from when
The header tells you whether you are reading the sheet in force, when it took effect and which regulatory decision set it. Kentucky’s regulation spells out what every sheet after the cover must show: the utility’s name, the commission tariff number, the sheet number and any sheet it cancels, the date of issue and the effective date, the signature and title of the person who issued it, and, where it applies, the order that authorized it (807 KAR 5:011, Section 3).
Here is LG&E’s Rate RS header, as filed:
- “P.S.C. Electric No. 14, Second Revision of Original Sheet No. 5, Canceling P.S.C. Electric No. 14, First Revision of Original Sheet No. 5.” This is the third version of Sheet 5 in this tariff book. The one it cancels no longer applies.
- “Date of issue: August 28, 2026.” In Kentucky, the date the utility’s representative signed the sheet (807 KAR 5:011, Section 1).
- “Date effective: With service rendered on and after September 1, 2026.” The new prices apply to electricity used from that date. A bill whose period straddles the date can carry some days at the old prices and some at the new. The North Carolina Public Staff explains the same effect for riders that change mid-period: two lines for one charge, not a double charge.
- “Issued by authority of an Order of the Public Service Commission in Case No. 2025-00341 dated August 18, 2026.” The case number leads to the docket where the change was decided.
Other sheets in the same book carry different dates. LG&E’s Rate RS late payment terms (Sheet No. 5.1) were issued March 6, 2026, effective with service on and after February 16, 2026, under Case No. 2025-00114. A rate can therefore be partly old and partly new; check the header of each sheet you rely on.
The letters in the margin
Revised sheets carry symbols in the margin beside each change. Kentucky’s regulation sets them: “(D)” for deletion, “(I)” for increase, “(N)” for a new rate or requirement, “(R)” for reduction and “(T)” for a change in text (807 KAR 5:011, Section 6). The September 2026 revision of LG&E’s Sheet 5 carries I marks beside its charges, which tells you the prices went up without your having to find the old sheet. Search engines often return canceled sheets from earlier years, so look for the words “Canceling” and “Date effective” before trusting any number.
Why a rate schedule changes: rate cases and fuel reviews
A sheet changes when the commission orders it. The case number in the header tells you which kind of proceeding did it. LG&E’s current tariff book was issued March 6, 2026, effective with service on and after February 16, 2026, under the order in Case No. 2025-00114, which is cited on most sheets. The September 2026 revision of Rate RS cites a different case, and the docket explains why.
Case No. 2025-00341 was the PSC’s examination of LG&E’s fuel adjustment clause for November 1, 2022, through October 31, 2024. Its final order of August 18, 2026 approved the fuel charges and credits for that period, denied LG&E’s proposed base fuel cost of $0.02999 per kWh, and set it at $0.02987. It then told LG&E to raise its base energy rates by $0.00127 per kWh for service on and after September 1, 2026, the difference between the prior base fuel cost of $0.02860 and the new one. That is the increase marked on Sheet 5. From the September 2026 expense month, the fuel clause measures fuel cost against the new $0.02987 base.
In plain terms, part of the fuel cost moved from one line of the bill to another: from the monthly fuel factor into the base energy charge. The docket entry explains in one paragraph what the revised sheet only marks with a letter.
Base rate cases are larger. The North Carolina Public Staff summarizes the legal standard in its state: the commission must approve rates that let each utility “recover its expenses plus a reasonable return on its funds prudently invested.” The Washington commission adds that whenever the components of a bill change, the utility “must file a request” with the commission. Either way, the change shows up first as a filing in a docket and later as a revised sheet.
Applicable and availability: who may take the rate
Before the prices, a Kentucky rate schedule says where it applies and who may take it, in captions the regulation fixes in this order: Applicable, Availability of service, Rates, Minimum charge, Late payment charge, Term and Special rules (807 KAR 5:011, Section 4). Other states’ tariffs use similar headings.
LG&E’s Rate RS is applicable “in all territory served” and available “for single-phase secondary delivery to single family residential service,” subject to the residential terms on Sheet No. 100. KU’s Rate RS adds a limit of its own: three-phase service on the rate “is restricted to those Customers being billed on this rate schedule as of July 1, 2004.”
Optional rates carry more conditions, and they are often what rules a household in or out. LG&E’s RTOD-Energy is available to customers who qualify for Rate RS and have “an electric AMI meter,” and it is “limited to a maximum of five hundred (500) Customers” on RTOD-Energy and RTOD-Demand combined, first come, first served. A customer who leaves it for Rate RS “may not be allowed to return to this optional rate for twelve (12) months.” Its terms add that customers on it “will not be eligible for Company’s Budget Payment Plan.”
When you read an availability section, look for:
- Meter requirements, such as an AMI (smart) meter for any time-based rate.
- Enrollment caps and how places are allocated.
- Equipment or ownership conditions, such as owning an EV, a battery or a heat pump.
- Minimum stays and return rules.
- Exclusions, such as budget billing or other programs you cannot combine with the rate.
- Interaction with net metering. LG&E’s NMS-2 rider bills consumption “in accordance with Customer’s standard rate,” so the export credit sits on top of whichever standard rate you choose.
The rate section: customer charge, energy charge and rating periods
The rate section lists the prices you multiply by your usage. On LG&E’s Rate RS, it has two lines:
| Charge | Rate RS (LG&E) | Rate RS (KU) | What it multiplies |
|---|---|---|---|
| Basic Service Charge | $0.48 per day | $0.58 per day | Days in the billing period |
| Energy charge | $0.11499 per kWh | $0.11396 per kWh | kWh used |
| of which infrastructure | $0.07481 | $0.07377 | |
| of which variable | $0.04018 | $0.04019 |
Sources: LG&E Sheet No. 5 and KU Sheet No. 5, both effective with service on and after September 1, 2026.
The Basic Service Charge is a daily customer charge. A 30-day LG&E bill carries $14.40 of it and a 31-day bill $14.88. LG&E’s sheet also says “The Basic Service Charge shall be the Minimum Charge,” so a month with zero kWh still costs that amount.
The energy charge is split into two parts, and the definitions printed on the sheet are worth reading. “Variable” is “the rate comprised of costs, such as fuel, that fluctuate with the production of energy used by customers.” “Infrastructure” is “the rate comprised of costs associated with meeting system demand that do not fluctuate directly with energy usage as well as the portion of fixed customer-related expenses not recovered in the Basic Service Charge.” In other words, about 65% of LG&E’s residential energy charge ($0.07481 divided by $0.11499 is 0.65) recovers costs that, by the sheet’s own definition, do not fluctuate directly with energy usage. The North Carolina Public Staff describes the same practice in general terms: for residential customers in particular, the energy charge “recovers certain fixed (non-variable) costs such as the power plants, wires, and poles.”
Rating periods and seasons
On a time-based rate, the rate section has one energy price per rating period, and a separate passage defines the periods. LG&E’s RTOD-Energy charges $0.09312 per kWh off-peak and $0.19307 on-peak (Sheet No. 6), and its Sheet No. 6.1 sets the periods “in Eastern Standard Time year-round”: 1 to 5 p.m. on weekdays from April through October, and 6 to 10 a.m. and 6 to 10 p.m. on weekdays from November through March, with weekends off-peak.
Read the split, and something useful appears. The variable part is $0.04018 in both periods; only the infrastructure part changes, from $0.05294 off-peak to $0.15289 on-peak. The whole price difference between the periods, 9.995 cents per kWh, is the cost of meeting system demand at peak hours. Our explainer on how time-of-use rates work shows how that difference sets the break-even share of peak-hour use.
Two other structures appear in the rate section of some schedules. Tiers price the first block of monthly kWh differently from later ones; PG&E’s E-TOU-C, for example, bills energy within a seasonal Baseline Allowance at a lower price. Demand charges add a price per kW of your highest draw; LG&E’s RTOD-Demand charges $0.06427 per kWh plus $4.32 per kW for base hours and $9.46 per kW for peak hours (Sheet No. 7), and our article on residential demand charges explains how that kW is measured.
Adjustment clauses: the charges added on top
Adjustment clauses are separate tariff sheets that add charges to the bill computed from the rate section, and they often change more often than the base rates. LG&E’s Rate RS sheet lists nine of them, introduced with the words “The bill amount computed at the charges specified above shall be increased or decreased in accordance with the following.” Each has its own sheet that explains how it is calculated:
| Adjustment clause (sheet) | How it is charged | What it covers, per the sheet |
|---|---|---|
| Fuel Adjustment Clause, FAC (85) | Per kWh, recalculated monthly | The difference between current fuel cost per kWh and a base fuel factor of $0.02987 per kWh (base period February 2023) |
| Off-System Sales, OSS (88) | Per kWh, combined with the FAC and billed as one factor | 75% of net margins from off-system power sales, per kWh sold |
| Demand-Side Management, DSM (86) | Per kWh; $0.00206 for Rates RS and RTOD from April 1, 2026 (86.10) | The cost of the utility’s demand-side management programs |
| Environmental Cost Recovery, ECR (87) | A percentage factor on the monthly billing amount | Approved environmental compliance costs |
| Retired Asset Recovery, RAR (89) | A percentage factor | Unrecovered costs of retired generating units |
| Pilot Generation Recovery, PGR (83) | A percentage factor | Costs of generation units, including energy storage facilities, that the PSC approved for recovery through this clause; it ends ten months after the next base rate case is filed, or when new rates take effect, whichever comes first |
| Home Energy Assistance, HEA (93) | $0.30 per month | Residential low-income energy assistance programs |
| Franchise Fee, FF (91) | Applied to the base rate and riders, before taxes, where a local government imposes one | Franchise fees, permitting fees or local charges set by ordinance |
| School Tax, ST (92) | The utility gross receipts license tax under state law | School taxes in counties that levy them |
All sheet numbers refer to LG&E’s tariff, P.S.C. Electric No. 14, checked November 22, 2026.
The monthly values for the fuel and off-system sales factor are not printed in the tariff. The OSS sheet says the combined monthly factor “shall be filed with the Commission ten (10) days before it is scheduled to go into effect,” and the factor in force appears on your bill. The percentage riders appear on the bill as dollar amounts; dividing each by the charges it applies to gives you its current percentage.
Other states use other names for the same ideas. The Washington Utilities and Transportation Commission’s bill guide explains that expected power costs are built into base rates and then “adjusted to reflect what a utility actually spent to provide power” once a year, and it describes decoupling surcharges that true up a utility’s revenue to the amount approved in its last rate case. The North Carolina Public Staff lists fuel, demand-side management and energy efficiency, renewable energy costs and low-income assistance among the costs its utilities’ riders cover, and notes that most riders change on the first day of a particular month, which may not line up with your billing period.
Fixed charges: what they cover and why they matter more on small bills
A fixed charge is the part of the bill that does not change with your kWh, and it is set in a rate case like the energy charge. The Washington commission says its basic charge “generally includes only specific costs, including bill preparation, payment processing, and meter installation and reading,” and that these costs “are set during a rate case and do not change without commission approval.” The North Carolina Public Staff says the basic customer charge covers the meter, meter reading and billing, and the basic facilities that connect a home to the grid. LG&E’s tariff states its own boundary in the definition of the energy charge’s infrastructure part: the fixed customer-related costs “not recovered in the Basic Service Charge” are collected through the infrastructure part of the energy charge instead.
The fixed charge does not change with usage, so its weight per kWh depends on how much you use. The chart spreads LG&E’s $0.48 daily charge and the $0.30 monthly HEA charge over a 30-day month.
The arithmetic: one more kWh costs $0.11499 plus $0.00206, or 11.705 cents. The fixed charges total $14.40 plus $0.30, or $14.70 for 30 days. Spread over 1,500 kWh, they add 0.98 cents per kWh; over 900 kWh, 1.63 cents; over 500 kWh, 2.94 cents. A small apartment, or a home whose rooftop solar covers most of its own use, pays a much higher average price per kWh bought than a large all-electric house on the same rate.
That gap matters for any savings estimate. Moving or avoiding a kWh changes the bill by the marginal price, not the average. LG&E and KU’s net metering page says net metering credits “never offset non-energy charges on a bill (such as gas and basic service charges),” and LG&E’s NMS-2 rider applies its export credit “only to the energy charge and any riders that are based on a per kWh charge.” A solar estimate that divides the whole bill by kWh will overstate what each exported or self-used kWh is worth.
The same parts under other names
Every utility has a customer charge, an energy price and a set of adjustments, but each names them differently. If you are reading a tariff outside Kentucky, this table helps you match the parts.
| Part of the schedule | LG&E and KU (Kentucky) | Other names you will see |
|---|---|---|
| Fixed customer charge | Basic Service Charge, $0.48 (LG&E) or $0.58 (KU) per day | Base Services Charge at SCE, $0.79 per day on its TOU plans; basic charge in Washington; Basic Customer Charge in North Carolina |
| Minimum bill | The Basic Service Charge is the minimum charge | SCE says its minimum charge “is no longer applicable” now that the Base Services Charge applies at zero usage |
| Energy charge | One price per kWh, split into infrastructure and variable parts | Tiered prices, such as PG&E’s lower price for energy within a seasonal Baseline Allowance |
| Fuel cost adjustment | Fuel Adjustment Clause, monthly, combined with the off-system sales factor | Power cost adjustment reconciled once a year in Washington; fuel rider in North Carolina |
| Program costs | Demand-Side Management Cost Recovery Mechanism | Energy efficiency and DSM riders |
| Revenue true-ups | Percentage clauses such as Environmental Cost Recovery | Decoupling surcharges in Washington |
| Optional add-on schedules | “Riders” such as NMS-2 net metering | Often called programs, options or riders |
Sources: LG&E and KU tariffs; SCE TOU plans page; PG&E TOU plans page; Washington UTC and North Carolina Public Staff bill guides; all checked November 22, 2026.
Two cautions carry across every state. First, the name on a line tells you little about how it is calculated; only the sheet does. Second, prices shown on consumer pages can be rounded or bundled. SCE’s plan page, for example, gives TOU prices to the cent and notes that they reflect “pricing for customers receiving both delivery and generation services from SCE,” so a customer who buys generation elsewhere pays a different total.
Turning a tariff into cents per kWh
This method turns any residential tariff, plus one recent bill, into a working price for each rating period. It takes about half an hour the first time.
- Confirm the schedule. Find the rate name on your bill, open the tariff sheet with that name, and check its header: in effect, not canceled, and the effective date you expect.
- Write down the fixed charges. The daily or monthly customer charge, and any flat adjustment such as LG&E’s $0.30 HEA charge. Multiply daily charges by the billing days.
- Write down the energy price for each rating period, and the season and hours each one covers, in the tariff’s clock.
- Add the per-kWh adjustments. Take per-kWh factors fixed in the tariff (LG&E’s DSM factor of $0.00206) from the sheet, and monthly factors (fuel and off-system sales) from your latest bill.
- Find the percentage riders. From your latest bill, divide each percentage rider’s dollar amount by the charges it applies to.
- Compute the marginal price per period: energy price plus per-kWh factors, times one plus the total percentage. This is approximate, since the sheets define each base precisely.
- Add local fees and taxes the same way, if your bill carries them.
- Check against the bill. Price your last month’s kWh and days with these numbers. If the total is within a few cents of the bill, your working prices are right; if not, a line is missing.
Example (fictional). A Louisville household on LG&E Rate RS has a 31-day October bill for 850 kWh. The rider amounts on this bill are invented to show the arithmetic; a real bill shows the real ones.
- Basic Service Charge: 31 days x $0.48 = $14.88.
- Energy charge: 850 kWh x $0.11499 = $97.74.
- DSM: 850 kWh x $0.00206 = $1.75.
- Fuel and off-system sales factor, as printed on this fictional bill: 0.350 cents per kWh, so 850 x $0.00350 = $2.98.
- Subtotal: $14.88 + $97.74 + $1.75 + $2.98 = $117.35.
- Percentage riders on this fictional bill: environmental surcharge 7.0% ($8.21) and two smaller riders totaling 2.0% ($2.35), applied to the subtotal.
- HEA: $0.30.
- Total before local fees and taxes: $117.35 + $8.21 + $2.35 + $0.30 = $128.21.
Average price: $128.21 divided by 850 kWh is 15.08 cents per kWh. Marginal price: (11.499 + 0.206 + 0.350 cents) x 1.09 = 13.14 cents per kWh. If this household moved to RTOD-Energy with the same rider values, its working prices would be (19.307 + 0.206 + 0.350) x 1.09 = 21.65 cents on-peak and (9.312 + 0.206 + 0.350) x 1.09 = 10.76 cents off-peak.
The example shows why the marginal price is the number to carry into any decision about shifting loads, adding solar or charging a car. The average price of 15.08 cents includes $14.88 of Basic Service Charge that no change in usage would remove.
Mistakes that distort a rate comparison
Most errors in homemade rate comparisons come from reading the right document the wrong way. These are the ones to check for:
- Using a summary page’s prices. LG&E and KU’s time-of-day web page still showed superseded prices in November 2026.
- Reading a canceled sheet. Search results often surface older versions; the header says which sheet is in effect.
- Using the average price for a marginal decision. Fixed charges stay on the bill whatever you shift or export.
- Ignoring the tariff’s clock. LG&E and KU’s time-of-day periods are written in Eastern Standard Time all year, so the summer peak is 2 to 6 p.m. on a daylight-time clock.
- Forgetting holidays and weekends. On LG&E and KU’s time-of-day rates, “If a legal holiday falls on a weekday, it will be considered a weekday.”
- Leaving out availability limits. A rate capped at 500 customers, or one that requires an AMI meter, may not be open to you.
- Treating the rider total as fixed. Fuel factors change monthly; percentage riders change when their filings do. A year of bills shows how much they move.
- Comparing bills without the days. Billing periods vary in length, and the daily customer charge varies with them. Compare kWh per day and cost per day, not monthly totals.
- Pricing a demand rate from kWh alone. A demand charge depends on your highest 15-minute or hourly interval, which a monthly kWh total cannot show; you need interval data.
- Mixing up kWh and kW. Energy charges multiply kWh; demand charges multiply the kW of your highest interval. The home energy glossary defines both.
What to do next
Gather the documents before you compare anything.
- Pull your last 12 bills and note the rate name, billing days, kWh and every rider line. The utility bill checklist lists what to find on the bill and on the schedule.
- Download the tariff sheets for your rate and every optional rate you might take, and note each header’s effective date.
- Get your interval usage if you are considering a time-based or demand rate. Our guide to Green Button data explains how to download it and what it shows.
- Build your working prices with the method above and check them against one bill.
- Keep the case numbers. When the utility files new sheets, the docket tells you what changed and when.
Culni is a software company that reads a home’s electricity rate and runs one daily schedule across rooftop solar, a home battery, EV charging and flexible loads, then checks the result against the bill each month. Its rate engine records the windows, seasons, fixed charges and riders described here, and the home energy plan opens with the rate decoded and every assumption shown. If you would rather have your own schedule read for you, you can send your rate plan and a recent bill.