Home energy glossary
Plain definitions for the words on your bill, your rate schedule and your equipment.
- Covers
- Bills, rates, solar export, batteries, EVs and programs
- Terms
- 39, each in a few plain sentences
- Kentucky
- NMS-1, NMS-2 and time-of-day rates, with dates and sources

Rate schedules, solar proposals and battery specification sheets use words that rarely appear anywhere else. This glossary explains them in plain terms, grouped by where you are likely to meet them. Where a definition uses the fictional example rate from this site, it says so; where it quotes real Kentucky values, it gives the effective date and the source.
Power, energy and meters
kW and kWh. A kilowatt (kW) is power: how fast energy is used or produced at a given moment. A kilowatt-hour (kWh) is energy: power sustained over time. A 1,000 watt heater running for one hour uses 1 kWh. Bills charge mostly for kWh. Charger ratings, battery power ratings and demand charges use kW. A 5 kW, 13.5 kWh battery can deliver up to 5 kW at once and holds 13.5 kWh in total.
AMI meter (smart meter). A meter on an advanced metering infrastructure that measures use at least hourly and provides the data to the utility and the customer at least once a day, as EIA describes it. About 73% of US residential meters were AMI meters in 2022. Many time-of-use rates require one, and its interval data shows how much of your use falls in each rate window.
Green Button. A standard format that lets customers download their own detailed energy usage from utilities that offer it. Useful for comparing rates with a year of real data.
Rates and bills
Rate schedule (tariff). The utility’s published document for a plan: prices, windows, seasons, eligibility and rules. The bill shows the rate’s name or code; the rate schedule explains it.
Flat rate. One energy price per kWh at every hour. LG&E’s Rate RS, for example, charges $0.11499 per kWh, effective September 1, 2026 (a base energy charge before riders and taxes).
Tiered rate. A rate whose price per kWh changes with the amount used in the billing period: the first block of kWh at one price, the next block at another.
Time-of-use rate. A rate whose price depends on the hour, the day type (weekday, weekend or holiday) and often the season. Also called time-of-day. It lowers a bill only if use moves out of the expensive hours.
On-peak. The most expensive window of a time-of-use rate. On this site’s fictional example rate it is 4 to 9 p.m. on weekdays at 31 cents per kWh. On LG&E’s RTOD-Energy rate, from April through October it is 1 to 5 p.m. on weekdays, set in Eastern Standard Time.
Off-peak. The cheapest window, usually overnight and on weekends. On the fictional example rate it runs 9 p.m. to 7 a.m. at 8 cents per kWh.
Shoulder. A window priced between peak and off-peak, often just before or after the peak. Some rates call it mid-peak. The fictional example rate’s day window (7 a.m. to 4 p.m. at 14 cents) plays a similar role.
Demand charge. A charge per kW based on your highest use over a short interval in the billing period, rather than per kWh. Some optional residential rates include one, such as LG&E and KU’s RTOD-Demand.
Basic service charge. A fixed charge per day or per month, whatever you use. Also called a customer charge. LG&E’s Rate RS sets it at $0.48 per day, effective September 1, 2026.
Rider. An additional charge or credit added to the base rate, also called an adjustment clause: fuel adjustment, environmental surcharge and others. Riders can change every month.
Solar and export
Net metering. A billing rule where each kWh you export offsets a kWh you buy, and extra kWh carry forward to the next bill.
Net billing. A billing rule where every kWh you buy is billed at the retail price, and each kWh you export earns a separate credit, usually lower.
Export credit. The value of one kWh sent to the grid. The fictional example rate uses 7 cents. LG&E’s NMS-2 credit is $0.07089 per kWh (tariff Sheet No. 58, effective February 16, 2026).
NMS-1. LG&E and KU’s net metering service for systems in service before September 24, 2021. Credits are in kWh, and on a time-of-day rate they apply only within the same time-of-day block. LG&E will end NMS-1 on September 24, 2046 and move customers to NMS-2.
NMS-2. LG&E and KU’s net metering service for systems first in service on or after September 24, 2021, up to 45 kW. All energy bought is billed at the standard rate, and each exported kWh earns a dollar bill credit, applied only to the energy charge and per-kWh riders. In practice it is net billing.
Self-consumption. The share of your solar production used in your own home, either as it is made or stored and used later, rather than exported.
Interconnection agreement. The agreement with your utility that lets your solar or battery connect to the grid. It can limit export, and it can decide whether a battery may charge from the grid. Changes to it are a matter for your installer and your utility.
Inverter. The device that converts the direct current from solar panels or a battery into the alternating current your home uses. Its kW rating limits how much power passes through it at once.
Batteries and backup
Usable capacity. The kWh a battery can actually deliver, as opposed to its total or nominal capacity. Always compare batteries on usable kWh.
Depth of discharge. The share of total capacity that can be used. A battery’s usable capacity is its total capacity times its depth of discharge.
State of charge. How full a battery is at a given moment, as a percentage of its capacity.
Reserve. The state of charge kept back for outages. A schedule that respects it never discharges the battery below it for savings. The fictional example home keeps 20%, or 2.7 kWh of 13.5.
Round-trip efficiency. The share of the energy put into a battery that comes back out. NREL’s 2024 Annual Technology Baseline uses 85% as a representative value for home batteries, so about 15% is lost on the way in and out.
Power rating. The kW a battery can deliver continuously. Some batteries also list a higher short-term rating for starting motors.
Critical loads. The circuits and appliances you want running during an outage. They are often wired to a separate backup panel, and only circuits connected to the battery receive backup.
Battery modes. The operating choices in a battery app. Self-use charges from surplus solar and discharges whenever the house needs more than the panels supply. Time-based follows a rate schedule you enter. Backup-only keeps the battery full for outages.
Grid charging. Charging a battery from the grid rather than from solar, usually off-peak. It is allowed only where the equipment and the interconnection agreement permit it.
EV charging
Level 1. Charging through a standard 120 volt outlet. The Department of Energy’s Alternative Fuels Data Center puts it at about 5 miles of range per hour, assuming 1.9 kW.
Level 2. Charging at 240 volts at home (208 volts in commercial settings). The AFDC notes that most residential Level 2 chargers operate at up to 30 amps, delivering 7.2 kW, or about 25 miles of range per hour; Level 2 equipment ranges from 2.9 to 19.2 kW.
Charging loss. Energy lost between the wall and the car’s battery. The fictional example home assumes 10%.
Managed charging. An arrangement where a utility or a program adjusts when an EV charges, often for an incentive. On event days, the program’s control can override the owner’s schedule.
Grid programs and standards
Demand response. Programs that ask or pay customers to reduce or shift use during periods of grid stress, called events. Peak time rebates, which pay for energy saved during event hours, are one form.
Virtual power plant (VPP). Many distributed energy resources, such as home batteries, rooftop solar, thermostats and EV chargers, coordinated so they respond together like a single power plant.
The next three are industry standards, described here as context. Culni does not claim certification under any of them.
IEEE 2030.5. A standard application protocol for utility management of the end-user energy environment, covering demand response, load control, time-of-day pricing, distributed generation and electric vehicles.
OCPP. The Open Charge Point Protocol, an open communication protocol between charging stations and charging management systems. Version 2.0.1 was approved as IEC 63584 in 2024.
OpenADR. An open, two-way information exchange model and smart grid standard for demand response and distributed energy resources.
Where these terms meet
Most of these words show up together in a home energy plan: the rate engine decodes the rate terms, the devices page covers inverters, batteries and chargers, and the example home puts the fictional example rate, a reserve and a charging window into one day. To find the terms on your own bill, use the utility bill checklist. Common questions are answered in the FAQ. When you want them applied to your home, check my home.
TodayYour turn
Send your rate and your devices
Your utility and rate plan, one recent bill and the devices you have or plan. We reply with a written home energy plan: your rate decoded, which devices can connect, the daily schedule and its estimated value with every assumption shown.
Remote. No site visit needed.