Kentucky net metering in 2026: LG&E and KU solar export credits explained

Kentucky net metering at LG&E and KU: NMS-2 pays $0.07089 or $0.07534 per exported kWh, NMS-1 credits kWh, and what the gap means for solar in 2026.

Reader question
How are solar exports credited by LG&E and KU today, and what does that mean for whether solar pays in Kentucky?
A stone well in a farmyard at midday, a full pail of water set by the kitchen door and a thin channel spilling over the well's lip toward a field beyond the fence.

LG&E and KU credit new rooftop solar under Rider NMS-2: every kWh your system sends to the grid earns a dollar bill credit of $0.07089 at LG&E or $0.07534 at KU, while every kWh you buy is billed at the standard rate, $0.11499 per kWh at LG&E and $0.11396 at KU on Rate RS. Credits reduce only energy charges and per-kWh riders, carry forward from bill to bill, and end when the account closes. Systems in service before September 24, 2021 keep the older kWh-for-kWh NMS-1 terms until September 24, 2046.

For a solar decision in Kentucky, that means a kWh you use at home is worth about 1.6 times a kWh you export at LG&E and about 1.5 times at KU, based on the tariffs checked November 22, 2026. With the federal 25D credit gone for systems installed after 2025, the size of the system, the share of its output used in the house and the timing of household loads now decide more of the value than any headline payback figure. Prices in this article are base charges before riders and taxes.

NMS-2 at LG&E and KU: the terms in one table

NMS-2 is a rider: it sits on top of your normal rate schedule and changes how exports are credited, not how purchases are billed. The terms below come from Sheet No. 58 in each utility’s tariff, effective with service on and after February 16, 2026, issued under the Public Service Commission’s orders in Case 2025-00114 (LG&E) and Case 2025-00113 (KU).

Term LG&E KU
Who it applies to Customer-generators whose system first reached in-service status on or after September 24, 2021 Same
Eligible systems Solar, wind, biomass or biogas, or hydro, on the customer’s premises, owned and operated by the customer, up to 45 kW Same
Purchases All energy consumed billed at the customer’s standard rate Same
Export credit $0.07089 per kWh delivered to the grid $0.07534 per kWh delivered to the grid
What the credit offsets Only the energy charge and riders based on a per kWh charge Same
Unused credit Carried forward and drawn on as needed; ends with the account; not transferable between customers or locations Same
Rate structure protection A customer on a two-part rate may keep a two-part structure for 25 years from the start of NMS-2 service Same

The heart of the rider is one sentence on Sheet No. 58: the company will “(a) bill Customer for all energy consumed from Company in accordance with Customer’s standard rate and (b) … provide a dollar denominated bill credit for each kWh Customer produces to the Company’s grid.” The bill nets the two dollar amounts over the billing period. The kWh themselves are never netted against each other.

What “two-part rate structure” protects

Rate RS is a two-part rate: a basic service charge per day ($0.48 at LG&E, $0.58 at KU) plus an energy charge per kWh. Kentucky law, KRS 278.466(5), allows a utility to propose rates that recover “fixed and demand-based costs” from customer-generators, which could include a demand charge measured in kW. The NMS-2 sheet lets a customer who starts on a two-part rate stay on a two-part structure for 25 years from the date NMS-2 service began. It does not freeze the prices within that structure, which change with rate cases.

What the credit cannot touch

LG&E and KU’s net metering page adds three practical limits. Credits “never result in cash payments”, even when an account closes. They “do not earn interest”. And they “never offset non-energy charges on a bill (such as gas and basic service charges)”. A home with a large bank of credits still pays $14.40 a month in basic service charges at LG&E in a 30-day month ($0.48 x 30), or $17.40 at KU ($0.58 x 30), plus gas service if it has it.

What an exported kWh earns compared with a kWh you use

Under NMS-2 there are two prices for the same kWh of solar. A kWh used in the house as it is produced, or stored in a battery and used later, avoids a purchase at the energy charge. A kWh that flows out through the meter earns the credit.

What one kWh is worth to an LG&E or KU solar home on NMS-2Horizontal bars in cents per kWh. At LG&E a kWh used at home avoids the Rate RS energy charge of 11.499 cents and a kWh exported earns a 7.089 cent credit. At KU the figures are 11.396 and 7.534 cents. Base charges before riders and taxes.LG&E, kWh used at home (Rate RS energy charge)11.499 centsLG&E, kWh exported (NMS-2 credit)7.089 centsKU, kWh used at home (Rate RS energy charge)11.396 centsKU, kWh exported (NMS-2 credit)7.534 cents
Source: LG&E tariff P.S.C. Electric No. 14 and KU tariff P.S.C. No. 21, Rate RS Sheet No. 5 (effective September 1, 2026) and Rider NMS-2 Sheet No. 58 (effective February 16, 2026), checked November 22, 2026. Base charges before riders and taxes.
LG&E KU
Rate RS energy charge (avoided by a kWh used at home) $0.11499 $0.11396
NMS-2 credit (earned by a kWh exported) $0.07089 $0.07534
Gap per kWh $0.04410 $0.03862
Ratio, used to exported 1.62 to 1 1.51 to 1

The arithmetic is simple: $0.11499 minus $0.07089 is $0.0441, and $0.11499 divided by $0.07089 is 1.62. At KU, $0.11396 minus $0.07534 is $0.03862, and the ratio is 1.51.

Riders widen the picture slightly

The energy charge is not the whole price of a kWh. Rate RS lists adjustment clauses on top of it, including the Fuel Adjustment Clause, the Off-System Sales Adjustment Clause, the Demand-Side Management Cost Recovery Mechanism, the Environmental Cost Recovery Surcharge and Retired Asset Recovery. At LG&E, the fuel and off-system sales factors are billed per kWh delivered (Sheets No. 85 and 88), while the environmental and retired asset factors are percentages of the billing amount (Sheets No. 87 and 89).

Because the NMS-2 credit applies to the energy charge “and any riders that are based on a per kWh charge”, exported credit can also absorb the per-kWh riders. The rider factors change month to month, so this article uses the base energy charge for comparisons and says so wherever a number appears.

How a month of production splits

Example (fictional). Suppose a solar system at an LG&E home on Rate RS and NMS-2 produces 800 kWh in a spring month. Compare two households with the same panels:

  • Household A uses 40% of the output in the house and exports the rest. Used at home: 320 kWh x $0.11499 = $36.80. Exported: 480 kWh x $0.07089 = $34.03. Value of the month’s solar: $70.82 (unrounded $36.797 plus $34.027).
  • Household B uses 60%. Used at home: 480 kWh x $0.11499 = $55.20. Exported: 320 kWh x $0.07089 = $22.68. Value: $77.88.

The 160 kWh that Household B keeps instead of exporting are worth 160 x $0.0441 = $7.06 more that month. At KU, Household A’s split would be worth $72.63 (320 x $0.11396 = $36.47, plus 480 x $0.07534 = $36.16). Under NMS-1 kWh netting on a flat rate, in a month when the home still buys more than it exports, all 800 kWh would be worth the energy charge: 800 x $0.11499 = $91.99.

The 800 kWh figure is an assumption for illustration, not a production estimate for any roof. Production depends on system size, orientation, shading and weather, and an installer’s design report is where a real monthly estimate comes from.

NMS-1: the older kWh-for-kWh terms, and who keeps them

NMS-1 credits kWh, not dollars. If a customer’s exports exceed purchases in a billing period, the difference becomes a kWh credit on the next bill, and the sheet is explicit that “a billing period credit is a kWh-denominated electricity credit only, not a monetary credit”. LG&E and KU’s page gives the arithmetic: a customer who exports 250 kWh and buys 150 kWh in a billing period receives a 100 kWh credit to offset usage in the next period.

Term (Sheet No. 57) NMS-1
Who Eligible facilities in service before September 24, 2021, up to 45 kW
How credit is figured Net kWh over the billing period; excess becomes a kWh credit
Time-of-day rates Credits created in a time-of-day block offset consumption only in the same block
Unused credit Carried forward; ends with the account; joint accounts keep credit while one holder remains at the location
End date The utility stops NMS-1 on September 24, 2046 and moves customers to NMS-2
Capacity changes A modification that materially increases capacity ends NMS-1 eligibility

Eligibility: in-service date or service start date

The tariff ties NMS-1 to a facility “in service before September 24, 2021” and NMS-2 to a facility that “first attains in service status on or after September 24, 2021”. LG&E and KU’s page explains it from the billing side: “The kind of credit you receive depends on the date your net metering service with KU or LG&E began, not when your generator was installed.” If your system went in around that date, your bill or the utility’s net metering group can confirm which rider you are on; this article cannot.

What ends NMS-1 early

Two changes matter. First, adding capacity: the sheet says a modification resulting in “a material increase in capacity” ends NMS-1 eligibility, and LG&E and KU’s page says NMS-1 customers who “add capacity or modify their systems will be switched to Rider NMS-2”. Ordinary replacements with only incidental capacity increases do not count. Second, batteries do not trigger the switch: the same page says “Additions of battery storage systems do not constitute net metering system capacity additions or modifications.”

Why NMS-1 survives a home sale

KRS 278.466(6) gives systems in service before the PSC’s first compensation order their existing terms, including “the one-to-one (1:1) kilowatt-hour denominated energy credit”, for 25 years at those premises, “regardless of whether the premises are sold or conveyed”. So NMS-1 attaches to the place, not the person, until the 2046 end date. Banked kWh credits do not: they end with the seller’s account.

How the Public Service Commission set the credit

The NMS-2 credit is not a market price or a utility choice. It is a rate the Public Service Commission (PSC) set in a contested case, built from estimates of what exported solar saves the utility.

Kentucky net metering at LG&E and KU: key datesA vertical timeline of six dates: the 2004 statute, the 2019 law effective January 1, 2020, the September 24, 2021 PSC order that created NMS-2 credits, the August 30, 2024 order that set the current credits, the February 16, 2026 tariff sheets, and the September 24, 2046 end of NMS-1. Spacing is not to scale.July 13, 2004KRS 278.466 created: Kentucky net metering lawJanuary 1, 20202019 SB 100 in effect: 45 kW limit, dollar creditSeptember 24, 2021PSC order, Case 2020-00350: first NMS-2 creditsAugust 30, 2024PSC order, Case 2023-00404: $0.07089 and $0.07534February 16, 2026Current NMS-1 and NMS-2 tariff sheets take effectSeptember 24, 2046NMS-1 ends; customers move to NMS-2
Sources: KRS 278.466 history note; Kentucky General Assembly 2019 SB 100 record; PSC orders of September 24, 2021 (Cases 2020-00349 and 2020-00350) and August 30, 2024 (Case 2023-00404); LG&E and KU tariff Sheets No. 57 and 58. Checked November 22, 2026. Spacing is not to scale.

The 2019 law

Kentucky’s net metering statute dates from 2004. In 2019 the General Assembly passed SB 100, “AN ACT relating to net metering”, signed on March 26, 2019 and effective January 1, 2020, according to the legislative record. It raised the maximum eligible system size to 45 kW, redefined net metering in dollar terms, required the PSC to set export compensation through ratemaking, and kept existing customers’ terms for 25 years.

The 2021 order: eight components

LG&E and KU’s first NMS-2 proposals would have valued exports at their avoided-cost purchase rates, and later at component values that the utilities argued were mostly zero. In its September 24, 2021 order, the PSC denied the proposed rates, approved NMS-1, and set NMS-2 credits from these components:

Component (2021 order, dollars per kWh) LG&E KU
Energy (with losses) 0.02478 0.02526
Ancillary services 0.00082 0.00084
Generation capacity (with losses) 0.02061 0.02106
Transmission capacity 0.00732 0.00732
Distribution capacity 0.00129 0.00185
Carbon cost 0.01338 0.01338
Environmental compliance cost 0.00105 0.00397
Jobs benefit 0 0
NMS-2 credit set in 2021 0.06924 0.07366

The listed components differ from the totals only by rounding in the order’s table: they sum to $0.06925 at LG&E and $0.07368 at KU. The same order rejected the utilities’ “proposed instantaneous credit for all energy exported” and required netting over the billing period, with the energy charge and per-kWh riders netted against exports. It also directed the utilities to evaluate job benefits as a component in their next rate case.

The 2024 update and the 2026 tariffs

In Case 2023-00404, LG&E and KU filed updates to the energy and generation capacity components. LG&E proposed raising its credit from $0.06924 to $0.07370 and KU from $0.07366 to $0.07821. On August 30, 2024 the PSC denied those proposals, changed the avoided capacity method from a combustion turbine proxy to a natural gas combined cycle unit, and approved credits of $0.07089 for LG&E and $0.07534 for KU. It also told the utilities to file evidence on the other components (energy, ancillary services, generation, transmission and distribution capacity, carbon, environmental compliance and jobs) in their next base rate case.

That next rate case produced the tariff now in force. The PSC’s February 16, 2026 orders set new base rates; a March 4, 2026 order in Case 2025-00114 corrected an appendix that had listed the NMS-2 rate as $0.11362 and replaced it with “Dollar-denominated bill credit: $0.07089 per kWh”, according to the case docket. The credit can change again in a future case, so check Sheet No. 58 before relying on it.

Reading a net metering bill from LG&E or KU

The bill shows energy delivered to you and energy received from you, not what your panels produced. LG&E and KU say your system’s app “will always be more” than the generation on the bill, “because your home or business will use some of that energy”. In each moment, production goes first to the house or to charging a battery, and “only the excess” flows through the net meter.

Example (fictional). An LG&E home on Rate RS and NMS-2, two 30-day months, base charges before riders and taxes:

A winter month. The meter records 650 kWh delivered to the home and 300 kWh received from it.

  1. Energy charge: 650 kWh x $0.11499 = $74.74.
  2. NMS-2 credit: 300 kWh x $0.07089 = $21.27.
  3. Energy charge after credit: $74.74 minus $21.27 = $53.48 (unrounded $53.477).
  4. Basic service charge: 30 days x $0.48 = $14.40.
  5. Subtotal before riders and taxes: $67.88.

A spring month. The meter records 150 kWh delivered and 400 kWh received.

  1. Energy charge: 150 kWh x $0.11499 = $17.25.
  2. NMS-2 credit: 400 kWh x $0.07089 = $28.36.
  3. Credit applied: $17.25, so the energy charge falls to $0.00. Credit carried forward: $28.36 minus $17.25 = $11.11.
  4. Basic service charge: $14.40, which the credit cannot offset.

In a real bill, per-kWh riders would add to the energy-related charges, and the credit would offset those too, using up slightly more of it.

Four things that make a bill look wrong

LG&E and KU’s page lists the usual causes of a surprising net metering bill:

  1. Higher use. Air conditioning, heating, pool pumps, more residents and new appliances all raise purchases, whatever the panels do.
  2. Season. “Solar energy production will decline substantially in the late fall and winter when compared to the spring and summer.”
  3. Budget billing. Levelized payments can reduce apparent savings in summer while moderating winter bills.
  4. Estimated reads. If usage and generation were estimated rather than read from the net meter, the credit can look low until a later reading corrects it.

If none of these explains the bill, the next question is whether the system is producing what it was designed to produce, which the utility directs to the installer. The utility bill checklist lists what to find on a bill and a rate schedule before you call.

Does solar pay in Kentucky after the federal credit ended?

It can, but the arithmetic has changed in two ways, and some cost guides have not caught up. The federal Residential Clean Energy Credit (25D) is gone for new systems, and since 2021 new systems export at a credit well below the retail price.

The federal credit is not part of the math for new systems

The IRS says 25D “will not be allowed for any expenditures made after December 31, 2025”, and that an expenditure counts as made when “the original installation of the item is completed”, so paying in 2025 for a system installed in 2026 does not qualify, according to its FAQ on Public Law 119-21. A quote or cost guide that still subtracts 30% for a 2026 installation is using a credit that no longer applies. What ended, what is left and how carryforwards work are covered in the federal solar tax credit after 2025. Rate Notes does not give tax advice; a tax professional decides how any credit applies to you.

Removing a 30% credit stretches a simple payback by a fixed factor if nothing else changes. If a system’s cost is C and its yearly value is V, the payback with the credit was 0.7 x C divided by V; without it, it is C divided by V, which is 1 divided by 0.7, or 1.43 times as long. Suppose a proposal showed a 10-year simple payback after the credit: without it, the payback is 14.3 years (10 divided by 0.7), before any other correction.

Kentucky’s prices sit below the national average

Kentucky electricity is cheaper than in most states, which lowers the value of every kWh solar replaces. The Energy Information Administration’s Electric Power Monthly puts Kentucky’s average residential price at 13.80 cents per kWh in August 2026, against a US average of 18.16 cents (2026 values are preliminary). Those averages include fixed charges and riders, which is why they sit above LG&E’s 11.499 cent base energy charge. EIA’s Kentucky profile for 2024 lists coal as the state’s primary energy source for electricity and an all-sector average retail price of 10.07 cents per kWh, ranked 40th in that table.

What some Kentucky cost guides get wrong

Several ranking pages that estimate solar savings for Louisville and Kentucky homes disagree with each other, and the differences usually trace back to five assumptions. Check any estimate, including an installer’s, against this list:

  1. A 30% federal credit for a 2026 installation. It no longer applies to expenditures made after December 31, 2025.
  2. Every kWh valued at the retail price. That is NMS-1 logic. A new system goes on NMS-2, where exported kWh earn $0.07089 or $0.07534.
  3. A statewide or national average price. EIA averages include fixed charges and riders that solar cannot avoid; the basic service charge stays on the bill whatever the panels produce.
  4. No split between used and exported kWh. Without it, an estimate cannot apply two prices, and it will overstate value for a household that is away during the day.
  5. Price escalation presented as fact. Future rates are set in rate cases. An estimate that assumes rising prices should show the assumption and the result without it.

A formula that replaces the headline payback

For a home on Rate RS and NMS-2, the yearly value of the panels can be written as:

Value = (kWh used at home x energy charge) + (kWh exported x NMS-2 credit)

Every planning choice works through one of those two terms. The table below shows how.

Decision What it changes Effect under NMS-2
System size Total kWh and the share exported Once midday output exceeds what the house uses, each extra kWh earns only the credit
Orientation and tilt Total kWh and the hours they arrive Output in hours the house is using power is worth the energy charge; output in empty-house hours is mostly exported
Household timing The share used at home Each kWh moved from export to home use gains 4.41 cents at LG&E, 3.86 at KU
A battery The share used at home, at a loss On Rate RS a stored kWh gains about 2.7 cents at LG&E after losses; more on a time-of-day rate (below)
Rate choice The price of the kWh avoided On RTOD-Energy, solar used during on-peak hours avoids $0.19307 at LG&E

Batteries and the time-of-day rate

A battery changes an export into later home use, minus losses. Using the 85% round-trip efficiency that the National Renewable Energy Laboratory’s Annual Technology Baseline 2024 adopts as representative, a stored kWh returns 0.85 kWh. At LG&E on Rate RS, that is worth 0.85 x $0.11499 = $0.0977 against $0.07089 for exporting, a gain of about 2.7 cents per stored kWh.

LG&E’s optional RTOD-Energy rate changes that arithmetic. Its on-peak price is $0.19307 per kWh and off-peak $0.09312 (Sheet No. 6, effective September 1, 2026). On-peak hours, set in Eastern Standard Time, run 1 to 5 p.m. on weekdays from April through October, and 6 to 10 a.m. and 6 to 10 p.m. on weekdays from November through March; weekends are off-peak. A stored kWh that replaces an on-peak kWh is worth 0.85 x $0.19307 = $0.1641, about 9.3 cents more than exporting it.

The rate has limits: it requires an AMI meter, is capped at 500 customers on RTOD-Energy and RTOD-Demand combined, and a customer who leaves it may not return for 12 months. Whether a solar home should switch is the subject of LG&E and KU time-of-day rates.

Using the gap: moving loads into sunny hours

The cheapest way to raise the value of NMS-2 solar is to use more of it when it is produced. Every kWh moved from export to home use gains the gap between the energy charge and the credit, and on Rate RS the clock does not change the energy charge, so any load that can wait for the sun is a candidate.

Example (fictional). An LG&E home on Rate RS and NMS-2 moves three loads into sunny hours on a clear Saturday, when the panels are exporting:

  • A heat pump water heater reheats its tank at midday instead of overnight: 2.0 kWh.
  • The dishwasher and one laundry load run at noon instead of after dinner: 2.5 kWh.
  • The EV, home for the weekend, charges from noon to 3 p.m. instead of overnight: 10.0 kWh.

That is 14.5 kWh that would otherwise have been exported at $0.07089 and bought back later at $0.11499. The gain is 14.5 x $0.0441 = $0.64 for the day (unrounded $0.63945). If the same moves happened on 8 sunny weekend days in a month, the gain would be 8 x $0.63945 = $5.12 for that month, a figure that depends entirely on the assumed loads and weather.

Two cautions keep this honest. First, the gain only exists while the panels are actually exporting; a load moved into a cloudy hour, or into an hour when the house already uses all the output, is simply bought at the energy charge. Second, the comparison changes on a time-of-day rate.

EV charging on RTOD-Energy

On LG&E’s RTOD-Energy rate, overnight charging costs the off-peak price of $0.09312 per kWh. Charging from midday solar costs the credit you give up, $0.07089, so solar charging saves $0.09312 minus $0.07089 = $0.02223, about 2.2 cents per kWh. That is half the Rate RS gain. On weekdays from April through October the on-peak window starts at 1 p.m. Eastern Standard Time (2 p.m. on the clock in summer), and any part of the charging that solar does not cover in those hours is bought at $0.19307, so a charger drawing more than the surplus can erase the gain. The EV charging page describes how a schedule handles departure times and charging windows.

Getting on NMS-2: application, interconnection and the meter

Net metering starts with an application to the utility, not with the installation. LG&E and KU’s page lays out the sequence, and the tariff’s interconnection guidelines (Sheets No. 110 to 110.5 at LG&E) set the technical rules.

  1. Read the requirements and pick the application level. A Level 1 installation is an inverter-based system certified to IEEE 1547 and UL 1741 that meets the tariff’s circuit conditions, such as aggregate net metering generation on a radial circuit not exceeding 15% of the line section’s most recent one-hour peak load. Anything else is Level 2.
  2. Submit the application with its attachments. The page lists a one-line electrical drawing, a site layout showing the AC disconnects, inverter and main panel, and the manufacturer’s inverter specification. A contractor may complete it. Battery power is entered in kW, not kWh.
  3. Wait for review. The utility answers a Level 1 application within 20 business days and a Level 2 application within 30. Level 2 carries a non-refundable $100 inspection and processing fee and up to $1,000 of documented costs for an initial impact study if one is needed. The page says “nearly all net metering applications do not have a fee”.
  4. Install after approval, with local permits. Cities and counties handle permits and inspections; LG&E and KU “do not automatically conduct inspections” but reserve the right to.
  5. Notify the utility when installation is complete. The utility orders and installs a net meter; net metering service begins when it is installed, and permission to operate follows.

Technical conditions that stay with the installer and the utility

The guidelines put several responsibilities on the customer: an anti-islanding safety feature “as required by applicable codes and standards”, compliance with the utility’s interconnection requirements, prior approval for changes, and, where the utility requires it, an external disconnect switch next to the meter. The customer must also “allow data communications between the Customer’s distributed generation equipment and the Company’s control systems” where the utility requires it for planning, reliability or power quality. KRS 278.466(7) requires systems to meet NEC, IEEE and accredited testing laboratory standards.

These are settings and equipment for a licensed electrician, the installer and the utility. No scheduling software should change them.

Questions for a Kentucky installer

Before signing, ask the installer to answer these in writing:

  1. Which rider and rate the savings estimate assumes, with the credit and energy charge used and their effective dates.
  2. How many kWh a year the estimate treats as used at home and how many as exported.
  3. Whether the system is expected to be a Level 1 or Level 2 interconnection, and who prepares the application and its attachments.
  4. Whether the utility is likely to require an external disconnect switch, and where it would go.
  5. Which local permits and inspections apply, and who schedules them.
  6. How the system’s monitoring separates production from export, so you can compare it with the bill.

Ownership and size limits

The statute and the tariff describe an eligible customer-generator as one who “owns and operates” the system, on the customer’s premises, mainly to supply the customer’s own use, up to 45 kW. If you are offered a lease or a third-party-owned system, ask the utility how it would be treated under the rider before you sign. KRS 278.466(1) also lets a utility stop offering net metering to new customers once cumulative net metering capacity reaches 1% of its single-hour peak load in a calendar year; LG&E and KU were accepting NMS-2 applications when checked.

Selling, moving or expanding a system

Three rules decide what happens to net metering when circumstances change.

Event What happens Source
You sell the house The installation can transfer to the buyer at the same premises after notice to the utility and a compliance check; NMS-1 terms stay with the premises until 2046 KRS 278.466(6) and (8)
You close the account Banked credits end; no cash refund Sheets No. 57 and 58; KRS 278.466(4)
A joint account holder leaves Credits carry forward while at least one holder remains at the location Sheets No. 57 and 58
You add panels A new application; on NMS-1, a material capacity increase moves you to NMS-2 Sheet No. 57; LG&E and KU page
You add a battery Not a capacity addition or modification for net metering purposes; the application asks for battery power in kW LG&E and KU page

Two consequences follow. A seller with a large credit balance cannot cash it out, so there is little point in building one before a move. And a buyer of a home with an NMS-1 system should ask for the in-service date and any later changes in writing, because the 2046 end date and the capacity rule decide how long the kWh-for-kWh terms last.

If your utility is not LG&E or KU

This article covers LG&E and KU. KRS 278.466 applies to every retail electric supplier under the PSC, but each utility’s credit is set in its own case, and the PSC keeps each utility’s tariff in its online tariff library. The general mechanics, and how they compare with other states, are in net metering vs net billing.

What to do next

Start with the rider you are on, then measure how much of your solar your home actually uses. A checklist for an LG&E or KU home:

  • Confirm whether you are on NMS-1 or NMS-2, and if NMS-1, your in-service date and the 2046 end date.
  • Pull 12 months of bills and note kWh delivered, kWh received and any carried credit.
  • Compare received kWh with your inverter’s production to estimate the share used at home.
  • Price the gap: 4.41 cents per kWh at LG&E or 3.86 at KU on Rate RS, before riders.
  • List loads you could move into sunny hours: water heating, laundry, pool pumps, EV charging on days the car is home.
  • If you are considering a battery or RTOD-Energy, compare 0.85 times the price of the hour you would replace with your credit.
  • For a new system, ask installers to show used and exported kWh separately, with the credit and energy charge they applied, and no federal 25D credit for a 2026 installation.

The net metering credit calculator compares a month under kWh netting and under a dollar credit, and the solar self-consumption calculator prices a higher self-used share; enter $0.11499 and $0.07089 for LG&E, or $0.11396 and $0.07534 for KU. The planning a system page lists what to ask before buying solar, a battery or a charger, and Louisville and Kentucky gives local rate context.

Culni, a Louisville home energy software company, builds a daily schedule from a home’s rate and its export credit; its solar export page explains how that schedule decides between using, storing and exporting surplus under NMS-1 and NMS-2. Culni is not affiliated with LG&E, KU or the PSC. If you want a written plan for your own rider and rate, the contact page lists what to send.

TodayYour turn

Want this worked out for your home?

Send your utility and rate plan, one recent bill and the devices you have or plan. We reply with a written home energy plan and every assumption behind it.