What to settle before buying a home charger, with the electrician, and after it is installed.

Before you buy
Car's AC limit, daily miles, Level 1 check, connector
With the electrician
Panel, circuit, permit, location and Wi-Fi
After installation
Off-peak schedule, departure time, programs
Items
15, saved as a CSV or printed
A charger box is mounted on a garage wall with gray conduit running along the wall to it and a spirit level resting on a shelf below.

Checklist

Tick items as you confirm them. Progress stays on this page only; download or print the list when you are done.

Before you buy
With the electrician
After installation

0 of 15 items confirmed

A home charger is a small project with three separate sets of decisions: what you need before you buy anything, what your electrician needs to settle, and what to set up once it works. Getting the first set right can save the cost of the second. This checklist has 15 items; tick them as you confirm each one, then download or print the list to take to your electrician.

Before you buy

Your car’s maximum AC charging rate. A charger cannot push more power than the car’s onboard charger accepts. The owner’s manual lists it in kW. A charger rated above that number charges no faster.

Daily miles and departure time. These decide how many hours the car needs each night. Run them through the EV charging time calculator.

Whether Level 1 already covers your daily miles. The Department of Energy’s Alternative Fuels Data Center puts Level 1, a standard 120 volt outlet, at about 5 miles of range per hour (assuming 1.9 kW). A car parked for ten hours overnight gets roughly 50 miles by that estimate. The fictional example home’s car, at 35 miles a day, needs about 5.8 hours on Level 1. If your numbers look similar, a new circuit may be optional.

The connector. Check that the charger’s connector (J1772 or NACS) matches your car, or that an adapter is supported for it.

Scheduling. Find out whether the charger can be scheduled from its own app, or whether the car can schedule charging itself. Either works for an off-peak schedule.

The federal credit for home charging equipment (30C) is gone: the IRS states it is not allowed for property placed in service after June 30, 2026. Culni gives no tax advice.

With the electrician

The electrician and your local inspector decide what the electrical code in your area requires. Settle these with them:

  • Panel capacity and a load calculation for the new circuit.
  • Circuit size, breaker and wire gauge for the charger’s amperage. The AFDC notes that most residential Level 2 chargers operate at up to 30 amps, delivering 7.2 kW.
  • Hardwired or plug-in (NEMA 14-50), and the GFCI requirements for each.
  • The permit and inspection your city or county requires.
  • Mounting location: cable reach to the car’s charge port, and Wi-Fi signal at that spot if the charger is to be scheduled from an app.
  • Whether a load management device or a smaller circuit avoids a panel upgrade. A smaller circuit charges more slowly; the time calculator shows whether it still fits your off-peak window.

After installation

Set the charging schedule to your off-peak window, in one place: the car or the charger. Two timers set to different hours can leave the car uncharged.

Set the departure time and target charge in the car or charger app, so the schedule works back from when you leave.

Check utility EV programs and EV rates, with their event rules. LG&E and KU, for example, run an Optimized EV Charging program that pays “$25 plus an additional $5 monthly participation incentive” and allows “up to 10 demand response events during the year”. On event days, the program’s control takes priority over any schedule. Culni is not affiliated with LG&E, KU or any utility program.

Confirm the inspection passed and the paperwork is filed.

What to do next

Price the charging with the EV charging cost calculator. The EV homes page covers homes with one or two cars, and Culni’s EV charging schedule picks the cheapest hours that still have the car ready by departure, through the charger or the car where a control path is confirmed for your home.

Culni does not sell or install chargers and does not do electrical work. Electricians who install chargers can see how Culni works with them after commissioning on the installers page. To get a charging plan for your car and your rate, check my home.